My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-156 AUTHORIZING AGREEMENT AMENDMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-156 AUTHORIZING AGREEMENT AMENDMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:59:17 PM
Creation date
1/14/2016 3:59:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-156
Res Ord Title
AUTHORIZING AGREEMENT AMENDMENT MACON COUNTY SOIL AND WATER CONSERVATION DISTRICT FOR SAND CREEK RESOURCE PLAN
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Watershed Erosion and Sediment Inventon�(Separate Boz) <br /> In 2001, an inventory of the Finley Creek«�atershed was done to estimate the average annual rate of <br /> erosion and sedimentation. Statistically valid sampling units were selected that represent 10%of the <br /> watershed. Field inventories were conducted on these units to assess current erosion conditions. This data <br /> was then used to calculate the annual average sheet and rill, ephemeral, gully and streambank erosion. <br /> This information from the sample units was expanded to calculate sediment delivery rates for each type of <br /> erosion and the sediment transport factor for the watershed. Ultimately,the goal was to estimate the total <br /> sediment load at the mouth of Finley Creek to Lake Decatur. The results are as follows: <br /> Tota1 Sediment Load Delivered=23,910-25,060 tons from 18,865 acres annually <br /> SHEET AND RILL EPHEMERAL GULLY STREAMBAIvK <br /> EROSION EROSION EROSION EROSION <br /> 41,SSO TONS 15.000 TONS 77O TONS 1,400 TONS <br /> ANNIJALLY, 58,720 TONS OF SOIL ERODING IN FINLEY <br /> CREEK WATERSIiED <br /> 22,760 TONS REACH 35,960 TONS OF SOIL <br /> LAKE DECATUR ARE RE-DEPOSITED <br /> IN THE WATERSHED <br /> 1,150-2,300 TONS OF SOIL <br /> FROM BEDIAAD MATERIAL <br /> Arrlvual,LY, 23,910-25,060 TONS OF 17,070 TONS OF solL �� <br /> SOIL ARE DELIVERED ON AVERAGE TO CAN BE REDUCED ' <br /> LAKE DECATUR � <br /> WITH CONSERVATION <br /> Conclusion <br /> The Finley Creek watershed is contributing to the issues in Lake Decaiur.To address the problems that <br /> are faced with the Lake,they must be addressed with input of stalceholders within each sub-watershed. <br /> With the input of the Finley Creek Committee this plan becomes a more useable tool. <br /> The existing problems will only get worse with development and construction that is expected to occur in <br /> the future. Planning and preparing for these issues now•will reduce potential problems of the future and <br /> improve cunent conditions. Everyone is encouraged to use this plan and learn more about his or her <br /> watershed. <br /> OS/31/02 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.