My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:25:08 PM
Creation date
1/14/2016 4:25:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-149
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT SEDIMENT STORAGE FACILITY & DREDGE MOBILIZATION SITE CONSTRUCTION
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�s -�".� <br /> .oi� , <br /> REQUEST FOR PROPOSAL <br /> & CHANGE ORDER <br /> � Date: 11-06-02 RFP Number: 2 Deletion of ro osed Ditch "A" im rovements <br /> p p P <br /> To: Koester Contracting Corporation City of Decatur Project 9956 <br /> 14649 Highway 41 North Lake Decatur Basin 6 Sediment Storage '', <br /> Evansville, IN 47725 Facility and Dredge Mobilization Site ', <br /> Construction � <br /> Agreement Date: 08-20-2002 �I <br /> The City of Decatur contemplates making certain changes, additions, and deletions to the work to <br /> be performed under the subject Agreement. Unless otherwise indicated in the description of <br /> change, accompanying drawings and specifications, all work shall conform to the contract <br /> documents. The Contractor is required to submit within 14 calendar days from the date herein a <br /> proposal and a detailed breakdown for this change. <br /> REASON for change: <br /> The recent repairs of the storm sewer in the area and the proposed closing of the existing breach in <br /> the northeasf corner of the perimeter dike will decrease the amount of flow in the proposed Ditch "A" <br /> so that the existing ditch will be able to handle the flow adequately. <br /> � DESCRIPTION of change including reference to drawings and specifications revised, new <br /> drawings and specifications issued: <br /> All of the proposed ditch grading and culvert work shown on attached Plan &Profile Sheet No. 13 and <br /> Cross-section Sheefs Nos. 135- 140 shall be deleted from the scope of work to be performed. <br /> SUB-CONTRACTORS affected by this change: <br /> , . NA <br /> Consideration: <br /> The work to be accomplished under this The Contract Lump Sum Amount shall be <br /> change order shall be completed within �e�sed/decreased) by the total sum of <br /> N/A calendar days from approval of <br /> this change order. $ 1Q�18��'� <br /> NOTE: Unless speci�cally indicated <br /> above, this does not extend the contract <br /> time. <br /> • The change described above and on accompanying drawings and specifications and the <br /> Contractor's proposal (if applicable) are hereby incorporated by reference and made a part <br /> hereof. <br /> I:\Municipalities\City_of Decatur�4572-3\Change Orders\Change Order No 2.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.