. � ,, � <br /> r•; ; . <br /> REQUEST FOR PROPOSAL <br /> • & CHANGE ORDER <br /> Date: 4-03-03 RFP Number: 4A Revisions to Dredge Mobilization Site <br /> access road vertical alignment, riprap <br /> ditches, excess earthwork disposal, <br /> removal of access road and work area lime <br /> stabilization, and addition of filter fabric at <br /> access road and work area <br /> To: Koester Contracting Corporation City of Decatur Project 9956 <br /> 14649 Highway 41 North Lake Decatur Basin 6 Sediment Storage <br /> Evansville, IN 47725 Facility and Dredge Mobilization Site <br /> Construction <br /> Agreement Date: 08-20-2002 <br /> The City of Decatur contemplates making certain changes, additions, and deletions to the work to <br /> be performed under the subject Agreement. Unless otherwise indicated in the description of <br /> change, accompanying drawings and specifications, all work shall conform to the contract <br /> documents. The Contractor is required to submit within 14 calendar days from the date herein a <br /> proposal and a detailed breakdown for this change. <br /> • REASON for change: <br /> The original design proposal resulted in a need to haul approximately 9,000 cy of excess earth <br /> excavafion maferial from the mobilizafion site to the sediment sforage facilify. Value engineering <br /> studies indicate that a change in fhe profile grade for the access road and reducing fhe amounf of <br /> excavation for the difches, along with fhe City's permission to use an area south of fhe east end of the <br /> access road for the disposal of excess earth excavafion material, will make it possible fo eliminate the <br /> need to haul excess material off-site. During consfrucfion it was found fhat the clay sub-base soils <br /> compacfed very well and the need for lime stabilization could be deleted. Filfer fabric was specified for <br /> placemenf under fhe aggregate roadway course. <br /> DESCRIPTION of change including reference to drawings and specifications revised, new <br /> drawings and specifications issued: <br /> The atfached revised Plan Sheefs Nos. C1-1, C1-2, C2-1, C2-2, & C2-3;and revised Cross-section <br /> Sheets Nos.X-1 through X-13 detail the proposed revisions to be made. <br /> The major work items affecfed by the revisions are tree removal, earth excavation, earth embankmenf, <br /> A-3 riprap ditch, filter fabric for riprap difches, increased pipe culvert lengfhs,seeding, lime <br /> stabilization, and filfer fabric for aggregate surface course. <br /> ,,ti <br /> SUB-CONTRACTORS affected by this change: r <br /> • `r.;. <br /> None. ��� <br /> » <br /> , ..,. <br /> I:\Municipalities\City_of Decatur�4572-3\Change Orders\Change Order No 4A.doc 1 <br /> ,. ., . <br />