�� . <br /> . �. <br /> a F . <br /> REQUEST FOR PROPOSAL <br /> • & CHANGE ORDER <br /> Date: 11-06-02 RFP Number 5 Revised riprap gradation and gabion <br /> layout for outlet ditch improvements at <br /> temporary easements 1A, 1B, & 2 <br /> To: Koester Contracting Corporation City of Decatur Project 9956 <br /> 14649 Highway 41 North Lake Decatur Basin 6 Sediment Storage <br /> Evansville, IN 47725 Facility and Dredge Mobilization Site <br /> Construction <br /> Agreement Date: 08-20-2002 <br /> The City of Decatur contemplates making certain changes, additions, and deletions to the work to <br /> be performed under the subject Agreement. Unless otherwise indicated in the description of <br /> change, accompanying drawings and specifications, all work shall conform to the contract <br /> documents. The Contractor is required to submit within 14 calendar days from the date herein a <br /> proposal and a detailed breakdown for this change. <br /> REASON for change: <br /> Value engineering studies indicate fhat a flatter grade at the downsfream portion of the proposed <br /> • riprap ditch improvement will permif fhe riprap gradation to be reduced in size from A4 to A3 for <br /> approximafely 350'of the ditch. The revised gabion placement provides more stability in the <br /> streambed layouf immediafely downstream of fhe existing 66"pipe culvert. <br /> DESCRIPTION of change including reference to drawings and specifications revised, new <br /> drawings and specifications issued: <br /> The attached revised Plan Sheet No. 19 shows fhe proposed locations for the A3 gradation riprap and <br /> the A4 gradation riprap. The A3 riprap shall be placed to provide an 8"minimum thickness wifh filfer <br /> fabric. The A4 riprap shall be placed fo provide a 16"minimum thickness with an 8"minimum bedding <br /> thickness and filfer fabric. <br /> Because the new difch cross-section will vary in order to accommodate the varying cross-secfion of <br /> the exisfing ditch, it is not possible to accurafely predict fhe quantities of riprap, bedding material, and <br />, filter fabric thaf will be required. For this reason, it is proposed that an accurate accounting of the <br /> actual materials installed shall be maintained, and the payment for this work shall be defermined on a <br /> unit cost basis for the acfual quantities installed. <br /> SUB-CONTRACTORS affected b this chan e: <br /> Y 9 <br /> None. ' <br /> • � <br /> I:\Municipalities\City_of_Decatur�4572-3\Change Orders\Change Order No 5.doc 1 <br />