My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:25:08 PM
Creation date
1/14/2016 4:25:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-149
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT SEDIMENT STORAGE FACILITY & DREDGE MOBILIZATION SITE CONSTRUCTION
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �� ; � KOES1'ER <br /> C O N T R A C T I N G c o a a. "AN EMPLOYEE OWNED COMPANY" <br /> • 14649 Highway 41 North <br /> Evansville, Indiana 47725 <br /> www.koesterco.com <br /> 812-867-6635 <br /> FAX 812-867-2302 <br /> April 14 2003 <br /> Chastain& Associates, LLP <br /> 5 N. Country Club Road <br /> Decatur, IL 62521 <br /> Attn: Mr. Don Sheffer, P.E. <br /> RE: Lake Decatur Basin#6 Sediment Storage Facility <br /> Change Order No. 5 —Revise Rip Rap Gradation& Gabions <br /> Dear Sir, <br /> As requested, we have reviewed the changes associated with revising the riprap gradation <br /> and gabion layout for the outlet ditch improvements at temporary easements lA, 1B &2. <br /> • Based upon the quantity of material delivered, we offer the following breakdown for this <br /> Change Order: <br /> Bolt Property Rip Rap Work = $40,482.56 <br /> Dredge Mob Site Rip Rap Work = $9,707.10 <br /> Extra Gabions 4 each at $500.00/each = $2,000.00 <br /> Tota1 Rip Rap Work = $52,189.66 <br /> The original bid was for 2,880 tons at $32.00/ton. This equals $92,160.00. Therefore: <br /> Original Bid Amount = $92,160.00 <br /> Revised Amount = $52,189.66 <br /> Total Credit = $39,970.34 <br /> Therefore, we are offering a credit in the amount of$39,970.34 for this change. <br /> We have attached a spreadsheet that shows the breakdown of materials provided. As back- <br /> up documentation for this Change Order. The gabions were provided at the pre-agreed <br /> price of$500.00 each for the four additional gabions provided. If you have any questions <br /> or comments in regards to this matter, please feel free to contact me at 812-868-6335. <br /> • Sincerely, <br /> `;�/ti�/�,�����`� <br /> Rick I. Niehaus, P.E. <br /> SA1A07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.