My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:25:08 PM
Creation date
1/14/2016 4:25:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-149
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT SEDIMENT STORAGE FACILITY & DREDGE MOBILIZATION SITE CONSTRUCTION
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! � <br /> � i . <br /> � f <br /> REQUESTFOR PROPOSAL <br /> & CHANGE ORDER <br /> � <br /> Date: 11-�-02 RFP Number: 6 Revisions to the Sangamon Road Crossing <br /> for the 18" HDPE dredge influent pipeline <br /> and casing <br /> To: Koester Contracting Corporation City of Decatur Project 9956 <br /> 14649 Highway 41 North Lake Decatur Basin 6 Sediment Storage <br /> Evansville, IN 47725 Facility and Dredge Mobilization Site <br /> Construction <br /> Agreement Date: 08-20-2002 <br /> The City of Decatu�contemplates making certain changes, additions, and deletions to the work to <br /> be perFormed under the subject Agreement. Unless otherwise indicated in the description of <br /> change, accompanying drawings and specifications, all work shall conform to the contract <br /> documents. The Contractor is required to submit within 14 calendar days from the date herein a <br /> proposal and a detailed breakdown for this change. <br /> REASON for change: <br /> Add'fional under+ground ufil'�ties along Sangamon Road were idenfified aft+er the origina!crossing <br /> • design was prepareal The locafion of these add"fional ufilities requines that a longer pipe casing be <br /> prov"►ded f�r fhe 1$'HDPE line. The Cihr originally proposed fo both supply and install the 18"HDPE <br /> line at this crossing location,buf the Cihr now proposes only to supply the 18"line and have fhe <br /> Contractor install the underground portion of the line. <br /> DESCRIPTION of change including reference to drawings and specifications revised, new <br /> drawings and specifications issued: <br /> The 24A sfeel casing length will be increased in length from 26'fo 32: The profile grade af the trench <br /> will be revised slightly to facilitate fhe installafion of the steel casing and the HDPE line. The Cihr wilt <br /> supply the HDPE line and the Confractor will pull it through the trench and the casing pipe.All tree and <br /> brush dearing required,if any, will be done by the Cit�r. The aitached Plan and Profile Sheet entifled <br /> Util'fir Crossinp At Sangamon Road replaces the Defail-Road C►�ssinp shown on the original Plan <br /> Sheef No. 18. <br /> SUB-CONTRACTORS affected by this change: <br /> Bodine, Inc. <br /> • <br /> C:1My DocumerrtslDecaturSediment(02}\Change Orders\Change Order No 6.doc 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.