My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:25:08 PM
Creation date
1/14/2016 4:25:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-149
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT SEDIMENT STORAGE FACILITY & DREDGE MOBILIZATION SITE CONSTRUCTION
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> . , � , <br /> REQUEST FOR PROPOSAL <br /> & CHANGE ORDER <br /> � <br /> Date: 11-06-02 RFP Number:� Revised location for construction site office <br /> 1 <br /> To: Koester Contracting Corporation City of Decatur Project 9956 �, <br /> 14649 Highway 41 North Lake Decatur Basin 6 Sediment Storage ' <br /> Evansville, IN 47725 Facility and Dredge Mobilization Site I <br /> Construction i <br /> Agreement Date: 08-20-02 <br /> The City of Decatur contemplates making certain changes, additions, and deletions to the work to <br /> be performed under the subject Agreement. Unless otherwise indicated in the description of � <br /> change, accompanying drawings and specifications, all work shall conform to the contract �� <br /> documents. The Contractor is required to submit within 14 calendar days from the date herein a �I <br /> proposal and a detailed breakdown for this change. I <br /> REASON for change: <br /> The Contractor requested that the construction sife office be relocafed to an alternafive site because <br /> fhe cost of providing temporary elecfrical service to the originally proposed site at fhe Sediment <br /> Storage Facility would be excessive. <br /> . DESCRIPTION of change including reference to drawings and specifications revised, new <br /> drawings and specifications issued: <br /> The proposed alfernative site is approximately'/<mile east and%mile north of the originally proposed <br /> site. Electrical service is already available at the alfernafive site and the site is available af zero rental <br /> cost from the private landowners. A minimum of additional aggregate surface course shall be required <br /> fo upgrade the alternafive site parking area. <br /> SUB-CONTRACTORS affected by this change: <br /> None. <br /> Consideration: <br /> The work to be accomplished under this The Contract Lump Sum Amount shall be <br /> change order shall be completed within (+�s�ease�l/decreased) by the total sum of <br /> N/A calendar days from approval of <br /> this change order. $ 5 ,p�$�,00 <br /> NOTE: Unless specifically indicated <br /> • above, this does not extend the contract <br /> time. <br /> I:\Municipalities\City_of_Decatu�14572-3\Change Orders\Change Order No 1.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.