Laserfiche WebLink
' J u ly 30, 2002 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> NO. 2002 - 56 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager � <br /> Stephen Swanson P. E., Director of Engineering & Infrastructur�� <br /> SUBJECT: Heritage Behavior Health Center Sewer Extension Agreement <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by City staff that the City Council approve the attached resolution approving <br /> an Agreement between the Heritage Behavior Health Center and the City for the cost sharing of <br /> a sewer extension in the area of North Charles Street and Running Reds Drive and authorizing <br /> the Mayor to sign said agreement. <br /> BACKGROUND: <br /> The Heritage Behavior Health Center received City Council approval for a living center at the <br /> southwest corner of the intersection of North Charles Street and Running Reds Drive. This <br /> property is not presently adjacent to a sanitary sewer main and a new sewer must be extended <br /> for this property to have service. The City Council, in its approval of the project, indicated a <br /> willingness to participate with Heritage for the extension of the sewer in consideration of being <br /> able to provide service to the Charles Street area. It was noted that this would enable the City <br /> to extend service to a non-sewered area, particularly the properties on the east side of Charles <br /> Street. <br /> City staff and Blank, Wesselink, Cook & Associates (BWC), engineers for Heritage, have <br /> reviewed the extension of a sewer to serve the new Heritage facility and the properties along <br /> Charles Street. It was decided that the preferred route is for the new sewer to extend east from <br /> existing 12-inch sewer that is approximately 800 feet west of the Heritage site. The new sewer <br /> would run along the south boundary of Stephen Decatur Middle School, the south side of <br /> Running Reds Drive and then turn south on Charles Street (refer to attached drawing). The <br /> Engineering Division has reviewed and tentatively approved the design of the new sewer <br /> prepared by BWC. <br /> City staff and BWC, representing Heritage, discussed options for the cost sharing of the new ' <br /> sewer between the City and Heritage. The basic options included cost sharing based on a !, <br /> percentage of the land area in the contributing basin, based on the percentage of contributing 'I <br /> flow or an agreed upon percentage split. The decision was made to use an agreed upon cost '� <br /> share for the new sewer. This decision was based on the difficulty to prepare and ensure a fair <br /> and equitable cost distribution for either of the first two methods given the uncertainty as to the <br /> ultimate development of the vacant ground in the area. <br /> Page 1 <br />