Laserfiche WebLink
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2002-48 <br /> July 15, 2002 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager � <br /> Stephen Swanson, P.E.,Director of Engineering & Infrastructure <br /> Matthew C. Newell, P.E., City Engineer <br /> SUBJECT: Proposed Addition to the Street Restoration Project, City Project 2002-08 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution authorizing an <br /> increase in the project funding for the Street Restoration Project, City Project 2002-08. The City <br /> is currently under contract with Dunn Company for $1,141,382.64 to perform the subject project <br /> which provides milling and bituminous overlay work for the City. The resolution enables the <br /> City Manager and the Director of Engineering & Infrastructure to increase the contract amount <br /> up to $82,000 to perform additional base failure repair work and to perform additional street <br /> resurfacing. <br /> BACKGROUND: <br /> The City performs an annual street base failure repair project on a yearly basis, this work <br /> generally consists of full depth bituminous patching of various street sections that have failed. <br /> This work is normally done at isolated spots on roads that do not currently need major <br /> resurfacing. The objective of this project is to lengthen the life of a pavement by repairing areas <br /> of significant damage. <br /> The City's current project provides some base failure repair work, however, the quantities are not <br /> provided on the contract to enable the contractor to complete the base failure quantities that have <br /> been cataloged by City Engineering. City staff is proposing that sufficient funding be authorized <br /> to allow additional base failure work be completed under the current Street Restoration Project <br /> currently being performed by Dunn Company. The added base failure work will add <br /> approximately$70,000 to the current contract. <br /> Dunn Company is generally the major bidder on the City's asphalt projects and is generally the <br /> sole bidder on the City's base failure work. <br />