My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-125 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-125 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 11:57:11 AM
Creation date
1/15/2016 11:57:10 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-125
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT UNION / CHURCH ALLEY COMBINED SEWER REPLACEMENT
Approved Date
7/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum I <br /> NO. 2002-35 ' <br /> June 19, 2002 , <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E.,Director of Engineering & Infrastructu e <br /> Matthew C. Newell, P.E., City Engineery�v✓� <br /> SUBJECT: Union/Church Alley Combined Sewer Replacement, City Project 2002-23 <br />' SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Union / Church Alley Combined Sewer Replacement, City Project 2002-23, to <br /> Burdick Plumbing & Heating Co., Inc., as the lowest, responsible bidder in the amount of <br /> $154,765, and that the Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> A sewer collapse occurred in a portion of the subject sewer in the late 2001. This collapse was <br /> repaired with an emergency work order. At the time of the collapse an in depth inspection was <br /> made of the combined sewer system in the Union / Church alley north of Grand Avenue and <br /> south of Division Street. The inspection determined that, in addition to the collapsed section, a <br /> portion of the sewer was in danger of collapse, there was significant cracking throughout the line <br /> and numerous house services that were failed. The segment of sewer in the alley between Grand <br /> and Division was in overall poor shape and in dire need of replacement. <br /> The project specifications were prepared by the Engineering Division. The project was <br /> advertised on May 29, 2002 and bids were opened on June 18, 2002. The results of the letting <br /> are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $242,870.00 ----- <br /> Burdick Plumbing & <br /> Heating Co., Inc. $154,765.00 (36.28%) <br /> Entler Excavating Co., Inc. $173,332.00 (28.63%) <br />
The URL can be used to link to this page
Your browser does not support the video tag.