My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-123 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-123 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 12:00:58 PM
Creation date
1/15/2016 12:00:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-123
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT DECATUR STREET STORM SEWER REPLACEMENT
Approved Date
7/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2002-36 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E., Director of Engineering & Infrastructure <br /> Matthew C. Newell, P.E., City Engineer`yyt� <br /> SUBJECT: Decatur Street Storm Sewer Replacement, City Project 2002-12 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Decatur Street Storm Sewer Replacement, City Project 2002-12, to Barr & Robison <br /> Sewer & Excavating, Inc., as the lowest, responsible bidder in the amount of$17,666, and that <br /> the Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> A portion of this storm sewer collapsed under the weight of a garbage truck in the spring of 2001. <br /> Emergency repairs were performed on this line at that time, however, the investigation <br /> determined that the remainder of the line had significant cracking and was experiencing minor <br /> failures. It was noted that voids were present under the pavement at various other locations along <br /> this pipe. This project will remove and replace the remaining portion of the storm sewer line. <br /> The project specifications were prepared by the Engineering Division. The project was <br /> advertised on June 5, 2002 and bids were opened on June 21, 2002. The results of the letting are <br /> as follows (bid tabulation attached): <br />
The URL can be used to link to this page
Your browser does not support the video tag.