Laserfiche WebLink
Ciient: City of Decatur 8 Village of Forsyth <br /> Time Line for Completion of Project <br /> Project Location: Route 51/Hickory Point Road Intersection Study <br /> APRIL ' MAY � JUNE 1 JUIY �AUGUST <br /> It@mNO. ItemD2SCfiDtiOn WeekBeginning 01-Apr OS-Apr 15-Apr 22-Apr 29-Apr�06-May 13-May 20-May 27-Mayl03-Jun 10-Jun 17-Jun 24-Juni 01-Jul 08-Jul 15-Jul 22-Jul 29-Juli 15-Aug <br /> 1 Proiect Manaqement and Administration <br /> 1.1 Project Set Up � ( <br /> Setup computer and hard copy files,budget and schedule 1 � <br /> 1.2 Project Progress and Closeout � � ( <br /> Maintain and closeout files,monitor budget and manpower � <br /> 1.3 Project Invoicing f � � <br /> Prepare,check and mail invoices � � i <br /> 2 Civil Studv Services <br /> 2.1 Coliect&assemble information from client # � i � <br /> 2.2 Plot mapping&set up stationing for 6 roadways � � � <br /> 2.3 Plot existing profiles for ail im rovements 6 rds <br /> 2.4 Plot access control limits and set new profiles ) � ^ � � <br /> 2.5 Analyze traffic data for lane configurations ( � <br /> 2.6 Perfortn weaving analysis for NB Ramp/Mall movement � � <br /> 2.7 Design geometry for full-straight thru intersection <br /> 2.8 Design geometry for east half intersection { <br /> 2.9 Design geometry for relocated fuli intersection ( � � <br /> 2.10 Redesign access road connections for 3 options � �";, i <br /> 2.11 Study drainage features for 3 options j '; � � <br /> 2.12 Study utility relocations for 3 options 1 <br /> 2.13 Prepare probable cost estimates for 3 options j ` ( <br /> 2.14 Meet with affected property owners(Assume 4) � <br /> 2.15 Coordinate with City,Forsyth and IDOT <br /> 2.16 Prepare and submit options to City&Village � � <br /> 2.17 Revise drawings per input from City&Village [ ( � ( <br /> 2.18 Prepare project report � # � � <br /> 2.19 Perform QA/QC of project deliverables <br /> 2.20 Submit deliverables(Project Report and Concept Drawings) <br /> � � � <br /> 3 Proiect Surveys � � � � <br /> 3.1 Prepare for survey and travel to and from site <br /> 3.2 Set up Horizontal and Vertical Control <br /> 3.3 Perform GPS topographical work and close out � <br /> 3.4 Download survey data to computer � � � � <br /> 3.5 Prepare eiectronic topo plan for concept work <br /> Page 4 of 4 <br />