Laserfiche WebLink
� R <br /> June 11, 2002 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> NO. 2002 - 33 <br /> MEMORANDUM TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager � <br /> Stephen Swanson, P. E., Director of Engineering & Infrastructure� <br /> SUBJECT: Central Park Fountain <br /> SUMMARY RECOMMENDATION: �I <br /> It is recommended by City staff that the City Council approve the attached resolution ��, <br /> authorizing a Change Order to Christy-Foltz in the amount of $58,695.00 for additional work '�, <br /> items for the new Central Park Fountain which were not included in the contract entered into on '� <br /> January 2, 2002. ', <br /> BACKGROUND: II <br /> A number of items associated with the new fountain were not included in the City's contract �I <br /> with Christy-Foltz. This was done to provide the City an opportunity to decide how or if it ' <br /> wanted to proceed with any of the associated items. The associated items included the sewer <br /> outfall, new concrete sidewalk, sidewalk replacement, lighting and landscaping. City staff is at <br /> this time making its recommendation on how to proceed with the items not included in the <br /> contract with Christy-Foltz. <br /> It is recommended that Christy-Foltz proceed to construct the two bordering sidewalk "rings" <br /> around the fountain and to make repairs to the concrete sidewalk damaged during construction <br /> through no fault of the contractor. In addition, staff is recommending that sections of existing <br /> sidewalk be replaced which are adjacent to the new outer "rings". This to provide a better <br /> match between the new and existing sidewalks. The attached drawing shows the <br /> recommended work. <br /> Christy-Foltz has submitted a price to install the two bordering "rings" of$29,037. City staff and <br /> Architectural Expressions have worked to modify the inner "ring" which was proposed to be a <br /> dyed concrete with an imprinted brick pattern. The modified inner "ring" is now proposed to be <br /> a dyed concrete having sawcut lines in the sidewalk surface that radiate outward from the <br /> fountain as shown on the attached drawing. The brick pattern was included as an alternate in <br /> the original bid for which Christy-Foltz bid $53,544. This amount included 12 flush mounted light <br /> fixtures. The proposed modification is considered to represent a complementary architectural <br /> feature to the fountain. Christy-Foltz proposes to do the adjoining sidewalk replacement work <br /> for $6,707. This work will include replacing a small section of the existing brick walk on the <br /> west side of the fountain immediately adjacent to the two new bordering "rings". It is <br /> recommended that the two "rings" and the concrete replacement work be added to the contract <br /> with Christy-Foltz for a total increase of$35,744. <br /> Page 1 <br />