My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-111 AUTHORIZING THE EXECUTION OF A CHANGE ORDER
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-111 AUTHORIZING THE EXECUTION OF A CHANGE ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 4:07:04 PM
Creation date
1/15/2016 4:07:03 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-111
Res Ord Title
AUTHORIZING THE EXECUTION OF A CHANGE ORDER CENTRAL PARK FOUNTAIN
Approved Date
6/17/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s Y � <br /> June 18,2002 AEX 2886c <br /> APPENDIX A <br /> NEW CENTRAL PARK FOUNTAIN <br /> DECATUR, ILLINOIS <br /> CHANGE ORDER NO. 1 <br /> 1 . Provide all work and materials to install four light fixtures <br /> & two junction boxes as indicated on drawing C01 .2 and �, <br /> C01 .3. $6,257.00 <br /> 2. Provide four light fixtures as specified on drawing C01 .2. � $8,165.00 <br /> 3. Provide all work and materials to install walkway around <br /> fountain as shown on drawing CO1 .1 and C01.3. �$29,037.00 <br /> 4. Provide all work and materials to remove brick pavers and <br /> install concrete west of the fountain per drawing CO1 .1 . �$2,971 .00 <br /> 5. Provide all work and materials to replace wlkway leading <br /> directly south to S. Park St per drawing CO 1 .1 . ` $3,736.00 <br /> 6. Provide and install stone benches with smooth finish at <br /> perimeter of fountain as indicated on drawing CO1 .1 . ` $8,529.00 <br /> TOTALS $58,695.00 <br /> K:\28xx\2886c\COl 02 06_19.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.