Laserfiche WebLink
s Y � <br /> June 18,2002 AEX 2886c <br /> APPENDIX A <br /> NEW CENTRAL PARK FOUNTAIN <br /> DECATUR, ILLINOIS <br /> CHANGE ORDER NO. 1 <br /> 1 . Provide all work and materials to install four light fixtures <br /> & two junction boxes as indicated on drawing C01 .2 and �, <br /> C01 .3. $6,257.00 <br /> 2. Provide four light fixtures as specified on drawing C01 .2. � $8,165.00 <br /> 3. Provide all work and materials to install walkway around <br /> fountain as shown on drawing CO1 .1 and C01.3. �$29,037.00 <br /> 4. Provide all work and materials to remove brick pavers and <br /> install concrete west of the fountain per drawing CO1 .1 . �$2,971 .00 <br /> 5. Provide all work and materials to replace wlkway leading <br /> directly south to S. Park St per drawing CO 1 .1 . ` $3,736.00 <br /> 6. Provide and install stone benches with smooth finish at <br /> perimeter of fountain as indicated on drawing CO1 .1 . ` $8,529.00 <br /> TOTALS $58,695.00 <br /> K:\28xx\2886c\COl 02 06_19.doc <br />