Laserfiche WebLink
. � I <br /> COUNCIL COMMUNICATION FORM ' <br /> Engineering & Infrastructure Memorandum <br /> NO. 2002-25 <br /> Apri129, 2002 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E.,Director of Engineering & Infrastructure <br /> Matthew C. Newell, P.E., City Engineer .,,�I� <br /> rv"" <br /> SUBJECT: Permanent Easement Purchase for City Project 9838 Drainage Area 30 <br /> (Albany/Fulton) Storm Drainage Improvements <br /> SUMMARY RECOMMENDATION: <br /> Staff recommends that the City Council approve the attached resolution authorizing the payment <br /> of $8,000 for the purchase of a permanent easement totaling approximately 8,300 square feet <br /> from Shane L. Cole located at 3347 East Orchard Drive. The acquisition of this permanent <br /> easement is necessary for the improvement of storm drainage in Drainage Area 30, located <br /> around the Albany/Fulton neighborhood. <br /> BACKGROUND: <br /> On December 7, 1998, the City Council authorized the design of storm drainage improvements <br /> for the area generally south east of the intersection of Albany / Fulton Streets. The proposed <br /> design of these improvements have been largely completed and the City is now in the process of <br /> acquiring this final easement to provide an outfall for the area storm drainage. <br /> The attached drawing details the proposed design along with the permanent easement requested <br /> to be purchased from Mr. Cole. Storm drainage in the area has a logical outfall to the southwest <br /> as delineated by the storm drain system proposed by this project. The permanent easement <br /> desired for this work encompasses the final outfall for the proposed storm drainage <br /> improvements to be completed with this project. <br />