My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-72 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-72 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 2:25:24 PM
Creation date
1/19/2016 2:25:23 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-72
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT RAW WATER PUMP STATION ELECTRICAL CABLES
Approved Date
4/30/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> Bodine Electric <br /> OF DECATUR <br /> ��`�,=��",.�:sss'�.,. ,�.-� <br /> T�__ — -- <br /> �� <br /> ESTABLISHED 1918 1845 North 22"d Street - P.O. <br /> Box 976 - Decatur, IL 62525 - (217) 923-2593 <br /> April 26, 2002 <br /> Ray McDanell <br /> City of Decatur <br /> South Water Treatment Plant <br /> Re: Estimate for cable replacement to Raw Water building. <br /> Dear Sir: <br /> Bodine Electric is pleased to quote the lump sum price of <br /> $68, 968 . 00 for the project referenced above. <br /> We will furnish material, labor, supervision, <br /> transportation and miscellaneous supplies to provide the <br /> services listed below: <br /> Furnish, install, and connect 2 new sets of inedium voltage <br /> cables from the main plant existing feeder circuit breakers <br /> to the existing raw water building switchgear. <br /> Notes and Exclusions: <br /> 1 .This estimate is based on using 1 existing spare duct <br /> in the duct bank between the buildings for 1 set of cables, <br /> removing one set of existing cables, and reinstalling the <br /> second set of cables in the duct that was cleared by <br /> removal of the existing cables . <br /> 2 .We have made no allowance for removal of the other set of <br /> existing cables . We have assumed that they will be <br /> abandoned in place after they are disconnected. <br /> 3. It will be necessary to splice these cables in the <br /> manhole immediately east of route 51 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.