Laserfiche WebLink
� <br /> � <br /> Bodine Electric <br /> OF DECATUR <br /> ��`�,=��",.�:sss'�.,. ,�.-� <br /> T�__ — -- <br /> �� <br /> ESTABLISHED 1918 1845 North 22"d Street - P.O. <br /> Box 976 - Decatur, IL 62525 - (217) 923-2593 <br /> April 26, 2002 <br /> Ray McDanell <br /> City of Decatur <br /> South Water Treatment Plant <br /> Re: Estimate for cable replacement to Raw Water building. <br /> Dear Sir: <br /> Bodine Electric is pleased to quote the lump sum price of <br /> $68, 968 . 00 for the project referenced above. <br /> We will furnish material, labor, supervision, <br /> transportation and miscellaneous supplies to provide the <br /> services listed below: <br /> Furnish, install, and connect 2 new sets of inedium voltage <br /> cables from the main plant existing feeder circuit breakers <br /> to the existing raw water building switchgear. <br /> Notes and Exclusions: <br /> 1 .This estimate is based on using 1 existing spare duct <br /> in the duct bank between the buildings for 1 set of cables, <br /> removing one set of existing cables, and reinstalling the <br /> second set of cables in the duct that was cleared by <br /> removal of the existing cables . <br /> 2 .We have made no allowance for removal of the other set of <br /> existing cables . We have assumed that they will be <br /> abandoned in place after they are disconnected. <br /> 3. It will be necessary to splice these cables in the <br /> manhole immediately east of route 51 . <br />