My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-70 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-70 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 2:51:16 PM
Creation date
1/19/2016 2:51:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-70
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT CONCRETE PAVEMENT JOINT REPAIRS
Approved Date
4/22/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• COUNCIL COMMUNICATION FORM <br /> � Engineering & Infrastructure Memorandum <br /> N0. 2002-22 <br /> April 18, 2002 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager �„ <br /> Stephen Swanson, P.E., Director of Engineering& Infrastructurc�✓ <br /> Matthew C. Newell, P.E., City Engineer,,,,� <br /> J„�- <br /> SUBJECT: Concrete Pavement Joint Repairs, City Project 2002-18 <br /> SUMMARY RECOMMENDATION: <br /> City staff has researched many of the obj ections raised by the Midwest Region Foundation for <br /> Fair Contracting, Inc. City staff is confident that sufficient controls are in place to assure the <br /> necessary compliance with the various contract requirements, including quality of work, <br /> adherence to the Prevailing Wage Act and project safety, along with the various statutes of the <br /> State of Illinois. The City and the Illinois Department of Transportation (IDOT) will have <br /> significant power to audit payments made by the contractor and to control the quality of work <br /> performed. <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Concrete Pavement Joint Repairs, City Project 2002-18, to Kinney Contractors, Inc., <br /> as the lowest, responsible bidder in the amount of$673,510 and that the Mayor be authorized to <br /> execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> • Research into Objections <br /> At the direction of the City Council, staff has conducted additional research into the objections <br /> placed upon Kinney Contractors and their ability to perform the work proposed by the City. As <br /> � part of this research, contact was made with Jack Kinney of Kinney Contractors, Michael Goetz <br /> of the Midwest Region Foundation far Fair Contracting, Inc. (FFC), the Illinois Department of <br /> Labor (IDOL) and the Illinois Department of Transportation (IDOT). In the interest of <br /> organization, an attempt has been made to place the objections and concerns appearing on the list <br /> prepared by the FFC into subgroups. <br />
The URL can be used to link to this page
Your browser does not support the video tag.