Laserfiche WebLink
- Page 3 <br /> • Contractor Work Performance ! <br /> City staff generally holds the Illinois Department of Transportation in high regard for the <br /> construction knowledge and insight they freely share with staff. IDOT does an enormous amount <br />' of highway work and their depth of knowledge and experience is considerable. City staff relies <br /> on them to a great degree in their experience with various construction practices and various <br /> contractors. <br /> In 2001, Kinney Contractors was awarded 21 projects by the Illinois Department of <br /> Transportation for concrete pavement patching work totaling $5,310,414. To bid on a project a <br /> contractor must have a Certificate of Eligibility, as issued by the State of Illinois, which <br /> authorizes a project eligibility amount called a Financial Rating. Kinney Contractors' current <br /> Financial Rating with the State of Illinois is $16,009,000. <br /> At the conclusion of each project, including all Motor Fuel T� projects, the contractor is rated <br /> by the various authorities (State or local) who oversaw the project. These ratings are used by <br /> IDOT to determine the eligibility of a contractor to perform future projects. Based on these <br /> factors IDOT has determined that Kinney Contractors is eligible to perform the pavement <br /> patching project proposed by the City. Considering the project volume that Kinney Contractors <br /> has, and is, performing for IDOT, it would be improper for staff to discount IDOT's experience <br /> with this contractor in concrete patching work. <br /> Kinney Contractors has performed pavement patching work for the City of Springfield. <br /> Springfield has stated that they found the workmanship and performance of the contractor to be <br /> acceptable. <br /> By entering into a contract with the City of Decatur, in partnership with the Illinois Department <br /> of Transportation, the contractor will be required to comply with the contract documents and <br /> submit to City and IDOT oversight,which includes: <br /> 1. A performance bond will be held by the City assuring proper and timely completion of <br /> the proj ect. <br /> 2. Workers compensation insurance coverage will be provided in accordance with the <br /> Illinois Workers Compensation Act. <br /> 3 Various forms of liability insurance will be provided by insurance companies acceptable <br /> to the City. <br /> 4. Detailed specifications and standards governing the method of construction and the <br /> quality of the finished product. Safety procedures are detailed as part of the standards and <br /> specifications governing the work. <br /> 5. Prevailing Wage Act requirements which include specified minimum hourly wages and <br /> fringe benefits. Adherence to this Act will be monitored by the City of Decatur and the <br /> State of Illinois. The City and the State will have the opportunity to audit and review the <br /> Contractor's payroll. <br /> 6. A City representative will be assigned to the project and be present at the site to monitor <br /> work and perform quality control. <br />