Laserfiche WebLink
. . ���� �� <br /> 111inois Department Final Report, Notice of Completion and <br /> � O�f Tt"allSpOt't�lOt1 � Acceptance of Improvement Constructed <br /> Under the Illinois Highway Code <br /> TP2 �-!6-vb <br /> �- <br /> Municipality Citv of Decatur The improvement was constructed in accordance with the plans approved by the ,��'-, <br /> Department on 04/17/2002 or as follows: (describe change) � <br /> County Macon ,�, <br /> w <br /> � <br /> Road District 5 Length as built Cross Section as built 24 Ft. <br /> Section 02 -00224-00- FP Road Bed Width 24 Ft. Surface Type Bit. Conc. �; <br /> Contractor Dunn Conpanv Inc. Width 24 Ft. Thickness 3 Inches <br /> Financial Statement <br /> ReCeived fo� Balance in Authorized Acct <br /> Total Funds construction Expended For TO BE <br /> Engineering Credited to Credited <br /> R.O.W. Unobligated Unobligated <br /> Source" Amount Const. Engr. R.O.W. Balance Balance <br /> MFT �$}49��02'�6 $1,294,202.46 �� <br /> � ���d3 <br /> � �D�Uau <br /> $�,Zsa,zo2.as $�,Zsa,2o2.as �Z� y�5, <br /> 'Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. <br /> Remarks <br /> Submitted 2/6/2006 ❑ County Engineer Gj -�- � <br /> Date � Municipal Engineer � <br /> Summary <br /> Final inspection of the work designated above was made on �� � — 0 3 Item Cost <br /> and it was found to be completed substantially in accordance with all the require- contract•• $�,415,sn.�2 <br /> menrs or tne pians, specification- wntr cr. i ne fi nciai staierr�en�is in Final Contract Cost• ��a���p�,�r„ <br /> accordance with my records. - <br /> I recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the City of Decatur <br /> Total Const.CosY'" $1,294,202.46 <br /> Said improvement is hereby accepted by the Department of Transportation. R.o.w. <br /> Engineering <br /> Approved <br /> ate <br /> . <br /> Submit to Regional Engineer. Total Cost $1,294,202.46 � <br /> 5 copies for Municipal Work <br /> 5 copies for County Work <br /> s copies for Road District work al Engineer ;" For Day Labor sections use estimated costs here. <br /> " Use actual construction cost regardless Contract <br /> or Day Labor construction. <br /> Page 1 of 1 BLR 13510(Rev. 12/05) <br /> Printed 2/6/2006 1:55:49 PM <br />