My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-47 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-47 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 4:26:11 PM
Creation date
1/19/2016 4:26:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-47
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES VULCAN WEST GRAVEL PIT
Approved Date
4/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'i � <br /> - 2. Construction Guidance-Furnish Guidance Services during the construction period generally � <br /> comprised of the following: <br /> a. Consult with the CITY and with the Contractor on interpretation of plans and <br /> specifications and regarding any changes under consideration as construction <br /> proceeds. <br /> b. Provide periodic job site inspection by the ENGINEER,or his representatives,during <br /> the construction period. <br /> c. Prepare and submit all payment estimates, change orders, records, and reports <br /> required by the CTTY. <br /> d. Safeguard the CITY against defects and deficiencies on the part ofthe contractor,but <br /> the ENGINEER does not guarantee the performance of the contract by the <br /> contractor. <br /> e. Conduct final inspection of construction and prepare final papers and reports. <br /> f. Revise contract drawings to show location and nature of improvement as actually <br /> constructed and supply "as built" drawings to the CITY. <br /> g. Inspect the contractor's operations for compliance with the plans and specifications <br /> and the keeping of complete project records. <br /> h. Check all shop and workirig drawings. <br /> i. Review and check all reports by testing laboratories on equipment and material tested. <br /> 3. Insurance <br /> A. The limits of liability for the insurance required by the AGREEMENT are as follows: <br /> 1. By ENGINEER <br /> a. Workers' Compensation Statutory <br /> b. Employer's Liability-- <br /> 1) Each Accident $ 500.000 <br /> 2) Disease, Policy Limit $ 500,000 <br /> 3) Disease, Each Employee $ 500,000 <br /> c. General Liability-- <br /> 1) General Aggregate $ 2,000,000 <br /> 2) Products- Comp/Op Aggregate $ 2,000,000 <br /> 3) Each Occunence (Bodily Injury& <br /> Property Damage) $ 1,000,000 <br /> BGM 02-044 Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.