My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-47 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-47 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 4:26:11 PM
Creation date
1/19/2016 4:26:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-47
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES VULCAN WEST GRAVEL PIT
Approved Date
4/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� THE CITY AGREES, � <br /> 1. Payment for all services for Items 1 a through 1 h and 2a through 2i rendered under the terms <br /> of this AGREEMENT sha11 be on a time and expense basis to be computed at the technical <br /> payroll cost to the ENGINEER times a multiplier of 2.1. Technical payroll cost is defined <br /> as the direct productive salary cost for time directly chazgeable to the project, plus fringe <br /> benefits and payroll burden (includes sick leave, vacation and holiday pay, unemployment <br /> taxes, contribution for social security, workmen's compensation, insurance, retirement <br /> benefits and medical insurance benefits). Reimbursement of expenses and costs incuned <br /> specifically in fulfilling the terms of this AGREEMENT such as,but not limited to, outside <br /> professional services, stakes, blueprints, supplies, toll calls, transportation and subsistence <br /> shall be at the actual cost. The aggegate of all chazges for the above work including the <br /> electrical sub-consultant shall not exceed a maximum amount of$28,500.00. <br /> 2. The ENGINEER may submit monthly or periodic statements requesting payment. Such <br /> statements sha11 be based upon the amount and value of the services provided and expenses <br /> incuned by ENGINEER to the date of the statement and shall be supplemented or <br /> accompanied by such supporting data as may be required by the CITY. <br /> IT IS MUTUALLY AGREED, <br /> 1. It shall be the ENGINEER's responsibility, when total monies due the ENGINEER as <br /> reimbursement for actual costs approach a point near 50% of the reimbursable actual costs <br /> specified above, to review the work accomplished and make an estimate showing costs <br /> incuned and costs of services still required of the ENGINEER to complete his obligation. <br /> He shall do the same prior to when the costs incuned reach 90%of reimbursable actual costs. <br /> If any of these estimates exceed the upper limit of reimbursable actual costs,the ENGINEER <br /> shall immediately submit the estimate to the CITY. The CITY shall review the estimate and <br /> promptly direct the ENGINEER to: <br /> a. Stop work at a logical point when monies due the ENGINEER are within the limit <br /> of reimbursable actual costs, or <br /> b. Continue work under the terms of the AGREEMENT up to an adjusted limit of <br /> reimbursable actual costs as authorized in writing by the CTTY. The ENGINEER <br /> will make no claim for payment in excess of the originallimit of reimbursable actual <br /> costs without having received such written authorization prior to incurring the excess <br /> costs. <br /> 2. The provisions of this Section and the various rates of compensation for ENGINEER's <br /> services provided for in this AGREEMENT have been agreed to in anticipation of the <br /> orderly and continuous progress of the PROJECT. Time is of the essence and therefore the <br /> project shall be completed with due diligence to conform to the agreed upon completion <br /> timing. Record Drawings and final reports shall be submitted to the CI1'Y within 30 days <br /> after final completion ofthe project by the Contractor. The ENGINEER sha11 not be respon- <br /> sible for any time delays in the PROJECT caused by circumstances beyond the <br /> ENGINEER's control. <br /> BGM 02-044 Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.