My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-05 AUTHORIZING APPROVAL OF THE PETITION FOR SPECIAL USE PERMIT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-05 AUTHORIZING APPROVAL OF THE PETITION FOR SPECIAL USE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 4:01:04 PM
Creation date
1/20/2016 4:00:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-05
Res Ord Title
AUTHORIZING THE APPROVAL OF THE PETITION FOR SPECIAL USE PERMIT FOR LAKE DECATUR BASIN 6 DREDGING
Approved Date
1/22/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONCERN . BACKGROUND INFORMATION ' ESTIMATED ESTIMATED . � <br /> AND CORRECTNE ACTION TO BE TAKEN FUTURE TIME <br /> CITY COST FRAME <br /> C. The construction of tlie BACKGROUND INrORMATION: Prior to the original construction, the general � <br /> oribinal storabe site altered surface water flow at the site was from south to north with three main outlets—one <br /> the overal) storm drainabe near the east end of the site, one near the center of the site, and one near the west end <br /> patterns from the draina6e of the site. After canstruction, the flow through the east outlet was significantly � <br /> patterns that existed prior to increased, the flow throubh the center outlet was significantly decreased,and tl�e flow <br /> construction of the site. through the west outlet was�moderately decreased. <br /> CORR�CTIVE AC'TIONS TO B�TAKEN: Durinb the construction for tlie reuse of No additional 2001-2002 <br /> the storage site,new drainage outlet structures will be placed at various locations along cost—included <br /> the perimeter berms to allow storm water to flow into the original east,center,and west in site reuse <br /> surface drainage outlets. Grading will be done within the perimeter berms to restore as construction <br /> closely as possible the pre-existing drainage patterns.Limited gtading will be done �osts <br /> prior to the start of the Basin 6 dredging operation,with the remainder of the grading � <br /> to be completed when the sediment has dried enough to suppprt the weight of <br /> earthmoving equipment. <br /> D. The fencin6 and �ates I3ACKGROUND TNrORMATION: A four-foot high woven wire fence with two <br /> installed for the oribinal strands of barUed wire, with gates at various locations, was installed along the entire ' <br /> storage site have not been perimeter of the original storage site.Tliere are several small locations where the gates <br /> properly maintained. and fencing have been removed for mowing and farming access. Currently, some of <br /> the gates are kept locked at al! times and some are not. <br /> . CORRECTNE ACTION TO B�TAKEN: Fencing and gates will be repaired when No additional 2001-200? <br /> construction begins to reuse the site. rencins wili be maintained in good repair and cost—inclu�iCd <br /> gates will be kept locked at all times except when needed for maintenance or farmin6 in site reuse <br /> operations. Gate keys will be provided to the Macon County Sheriff's Department and construction <br /> the City of Decatur Police Department for emergency access. . costs <br /> � l:. Tl�e site lias not been BACKGROUND 1NFORMATION: Prior to the year 2000,the City mowed the berm <br /> ►-3 mow�d as o!'ten as needed and the areas outside�of the perimeter berm only one time per year,per USDA NRCS <br /> �H and noxious weeds have not wildlife enhancement recommendations,and noxious weeds were minimally controlled <br /> been conh•olled. in some areas of the site. <br /> W CORRI:CI'IVI:AC'1'IUN TO RE'1'AKLN: The City will maintain the schedule the <br /> � Y $14,OU0 ?001-2010 <br /> established in 2000 of mowing the berms and outside the bern�s f'our times per year. If annually <br />� � the mowin6 prosram does not control the noxious weed browth,herbicidz will Ue <br /> � � a lied b licensed ersonnel as re uired. <br /> wy <br /> 0 <br /> � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.