' . <br /> . <br /> CHANGE ORDER <br /> Order No. 6 <br /> Date: 12/6/01 <br /> Agreement Date: 4/24/01 <br /> NAME OF PROJECT: SWTP Improvements Nitrate Removal Facility <br /> City Project No. 9953 <br /> OWNER: City of Decatur, Illinois <br /> CONTRACTOR: Diversified Buildin s Inc. <br /> 9 , <br /> The following changes are hereby made to the CONTRACT DOCUMENTS: <br /> Justification: The change order will provide a different method of connecting the Nitrate Facility to <br /> a future engine generator. The Nitrate Facility transformers will be connected through a loop feed <br /> switch to the engine generator. The change order will eliminate the modifications to the existing <br /> switchgear. The attached backup data provided by Diversified Buildings was reviewed and the <br /> cost included in the proposal appears reasonable and justified. <br /> Change to CONTRACT PRICE: <br /> Original CONTRACT PRICE: $6, 224, 000 <br /> Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $6,255,698. <br /> The CONTRACT PRICE due to this CHANGE ORDER will be increased by$9,435.00 <br /> The new CONTRACT PRICE including this CHANGE ORDER will be $6,265,133.00. <br /> Change to CONTRACT TIME: 0 calendar days <br /> The CONTRACT TIME will be (increased) by 0 calendar days. <br /> The date for completion of all work will be: <br /> Substantial Completion: 6/03/02 <br /> Final Completion: 8/02/02 <br /> Approvals Required: <br /> To be effective this Order must be approved by the State agency if it changes the scope or <br /> objective of the PROJECT, or as may otherwise be required by the Contract Do uments. <br /> Requested by:�o'`��.'�St�l�C� ��� S� ...0 i2C-. � � 12 �� �� <br /> � l - <br /> Recommended by: �`��„� � �,g-;c� ��E� 1�/Y�—o/ <br /> Ordered by: <br /> , <br /> Accep / , <br /> , � Z - �2it L <br /> State Age prova - - <br /> � ; <br />