Laserfiche WebLink
�! � ' CHANGE NOTICE <br /> Modern Electric Company of Illinois CCN#: RFP-12 <br /> 3180 North Woodford Date: Nov 29, 2001 <br /> Decatur, IL 62526 Job name: Nitrate Removal Facility <br /> Tel: 217-877-7125 Job number: NIT-2101 <br /> Fax: 217-877-9737 Page number: 1 of 2 <br /> E-mail: rstrack@springnetl.com <br /> Client address: <br /> Diversified Buildings, Inc. <br /> Attn: Mark Graham <br /> 866 N. Main Street <br /> Morton, Illinois 6155U <br /> USA <br /> Work Description <br /> This proposal includes the additional conduit from the newly mounted MV pull box to the existing MV switchgear. <br /> We plan to terminate the generator bay with 3M MV terminations and terminate the transformers with Cooper <br /> non-loadbreak MV elbows. I have broken this work into two steps. The first should be considered a must,while <br /> the second part would just tie up the loose end and prevent a Nitrate plant shutdown later. The second phase <br /> accounts for only 25% of the total cost of labor and 38%of the cost of materials. <br /> Item Description Qty Price U Hrs U Mat$ Tot. Hrs <br /> 3"GRC (GAL� 40 660.93 C 19.12 C 264.37 7.65 <br /> 3" GRC COUPLING 3 808.63 C 0.00 C 24.26 0.00 <br /> 3" GRC 90 ELBOW 3 3,032.37 C 150.00 C 90.97 4.50 <br /> 3"STEEL LOCKNUT 2 264.82 C 11.25 C 5.30 0.23 <br /> 3" INS STL GND BUSHING 1 2,199.26 C 35.00 C 21.99 0.35 <br /> 3" PLASTIC BUSHING 1 252.30 C 8.75 C 2.52 0.09 <br /> 3"GRC CUT&THREAD 3 0.00 C 98.75 C 0.00 2.96 <br /> #2 BARE-CU 280 386.05 M 17.55 M 108.09 4.91 <br /> #1/0/1C 5KV CU SHLD 133% 930 1,130.58 M 17.41 M 1,051.44 16.19 <br /> 3M#27 3/4"x66'GLASS TAPE 4 9.45 E 0.25 E 37.80 1.00 <br /> CABLE TAG 12 5.87 E 0.12 E 70.44 1.44 <br /> 3M#77 1 1/2"X20' FIRE TAPE 14 6.52 E 0.29 E 91.28 4.06 <br /> YEL 77 WIRE LUBE(LITRE) 2 6.16 E 2.50 E 12.32 5.00 <br /> POLYTWINE 300 12.17 M 3.75 M 3.65 1.13 <br /> 1/0 ELBOW 600A/15KV 9 210.00 E 2.11 E 1,890.00 18.99 <br /> SHEILD ADAPTER 9 6.74 E 0.55 E 60.66 4.95 <br /> GROUND STRAPPING KIT 9 3.28 E 0.32 E 29.52 2.88 <br /> #1/0 5KV HV TERMINATION 3 56.80 E 2.11 E 170.40 6.33 <br /> 3"FIELD CUT KO 1 6.00 E 0.75 E 6.00 0.75 <br /> 3/8"SCREW ANCHOR 4 0.00 C 15.00 C 0.00 0.60 <br /> 3/8" PLATED T-ROD 56 64.00 C 3.75 C 35.84 2.10 <br /> 3/8" ROD COUPLING 4 103.84 C 5.00 C 4.15 020 <br /> 3/8-16 HEX NUT(PLATED) 8 6.56 C 2.50 C 0.52 0.20 <br /> CD7B 3"COND CLMP C/W BOLT 4 73.22 C 15.00 C 2.93 0.60 <br /> B22 1-5/8"D 10'GALV SLOT 15 198.55 C 11.41 C 29.78 1.71 <br /> 4.16KV SWG POWER SHUT DOWN 1 0.00 E 1.50 E 0.00 1.50 <br /> Totals $4,014.23 90.32 <br /> Summary Total ($) <br /> General Materials 4,014.23 <br /> Material Total 4,014.23 <br /> Journeyman (67.74 Hrs @$40.87) 2,768.53 <br /> Foreman @ 25% (22.58 Hrs @$44.15) 996.91 <br /> Subtotal 7,779.67 <br /> Overhead (@ 10.000%) 777.g7 <br /> Markup (@ 5.000%) 427.88 <br />