Laserfiche WebLink
l <br /> � <br /> CHANGE ORDER <br /> Order No. 5 <br /> Date: 11/20/01 <br /> Agreement Date: 4/24/01 <br /> NAME OF PROJECT: SWTP Improvements Nitrate Removal Facility <br /> City Project No. 9953 <br /> OWNER: City of Decatur, Illinois <br /> CONTRACTOR: Diversified Buildings, Inc. <br /> The following changes are hereby made to the CONTRACT DOCUMENTS: <br /> Justification: The change order will provide a different method of connecting the Nitrate Facility to <br /> the plant power distribution system. The Nitrate Facility transformers will be connected directly to <br /> the main distribution transformers. The change order will reduce the physical layout of the new <br /> distribution equipment located in the Electrical Room. The attached backup data provided by <br /> Diversified Buildings was reviewed and the cost included in the proposal appears reasonable and <br /> justified. <br /> Change to CONTRACT PRICE: <br /> Original CONTRACT PRICE: $6, 224, 000 <br /> Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $6, 234,217. <br /> The CONTRACT PRICE due to this CHANGE ORDER will be increased by$21,481.00 <br /> The new CONTRACT PRICE including this CHANGE ORDER will be $6,255,698. <br /> Change to CONTRACT TIME: 0 calendar days <br /> The CONTRACT TIME will be (increased) by 0 calendar days. <br /> The date for completion of all work will be: <br /> Substantial Completion: 6/03/02 <br /> Final Completion: 8/02/02 <br /> Approvals Required: <br /> To be effective this Order must be approved by the State agency if it changes the scope or <br /> objective of the PROJECT, or as may otherwise be required by the ontract Do uments. <br /> Requested by:��ve�5�'C`e� ���q S,� �-vLC , � d�U ��� 3 �a 1 <br /> �J <br /> Recommended by: �� �C� ��� � iz-G �a C <br /> Ordered by. <br /> ' �/, / <br /> Accepted by: <br /> � ATTEST: �� � 1 , <br /> State Agency Approv � �C� _� '� ���� <br /> City Clerk <br />