Laserfiche WebLink
' � � �� � <br /> � <br /> fl�lodern Electric �ompany of Illinois CCN#: RFP-3 ����y �'�`��� r� <br /> 3180 Nortli Woodford Date: Aug 16, 2001� <br /> Decatur, IL 62526 Job name: Nitrate Rernoval Facility <br /> Tel: 217-877-7125 Job number: NIT-2101 <br /> Fax: 217-877-9737 Page number: 1 of 3 <br /> E-mail: rstrack@springnet1.com <br /> Client address: <br /> Diversified Buildings, Inc. <br /> Attn: Mark Graham <br /> 866 N. Main Street <br /> Morton, Illinois 61550 <br /> USA <br /> Work Description <br /> Per our round table discussion on July 13, 2001 and conference memorandum by B&V dated July 16, 200,we propose the following: <br /> Install 4" PVC Coated GRS conduit with 3#500Kcmil 5Kv 133% Ins and#1/0 Bare CU GND. Shielded cables from the main <br /> plant transformer secondary to the Ampgard, 400amp vacuum-sealed contactor. The contactors will feed transformers <br /> T-7&T-8 via 3" PVC Coated GRS conduits from building exterior wall to grade level then to PVC conduit as planned. <br /> Transfonner's T-7&T-8 include the proposed modification to support the Loop Feed for the future generator. <br /> Conduit penetrations into the existing building will be at an elevation higher than the retaining wall in order to avoid the <br /> existing conduits inside the building. <br /> We reserve the right to correct this quote for errors and omissions following the engineering review. <br /> This change notice does include the conduit duct for the future generator. <br /> This price reflects the wage increases due December 1, 2001 to May 31, 2002. If the work is not completed by November 30, 2001, <br /> this price shall apply. <br /> Item Description Qty Price U Hrs U Mat $ Tot. Hrs <br /> 3"GRC (GAL� -20 572.81 C 19.12 C -114.56 -3.82 <br /> 4" GRC (GALV) 30 812.49 C 29.25 C 243.75 8.7g <br /> 4" GRC MYERS HUB 2 1,942.32 C 125.00 C 38.85 2.50 <br /> 3" GRC COUPLING -12 750.87 C 0.00 C -90.10 0.00 <br /> 3" GRC 90 ELBOW -12 2,815.77 C 150.00 C -337.89 -18.00 <br /> 4" GRC 90 ELBOW 4 5,049.90 C 232.50 C 202.00 9.30 <br /> 3" GRC-18R 90 ELB 4 5,430.75 C 150.00 C 217.23 6.00 <br /> 3"STEEL LOCKNUT -16 215.17 C 11.25 C -34.43 -1.80 <br /> 4" STEEL LOCKNUT 10 457.43 C 18.75 C 45.74 1.88 <br /> 2" SEALfNG LOCKNUT 4 274.45 C 7.50 C 10.98 0.30 <br /> 3" SEALING LOCKNUT 2 1,070.39 C 11.25 C 21.41 0.23 <br /> 3" INS STL GND BUSHING 8 1,786.90 C 35.00 C 142.95 2.80 <br /> 4" INS STL GND BUSHING 4 2,710.06 C 52.50 C 108.40 2.10 <br /> 3" PLASTIC BUSHING -8 204.99 C 8.75 C -16.40 -0.70 <br /> 3"MINERLC/BOLT -4 80.89 C 22.50 C -324 -0.90 <br /> 3"GRC CUT&THREAD -4 65.00 C 98.75 C -2.60 -3.95 <br /> 4" GRC CUT&THREAD 12 85.00 C 137.50 C 1020 16.50� <br /> __ 2" PVC COATED GRC 80 556.87 C 34.50 C 445.50 27.60� <br /> 3" PVC COATED GRC 110 1,064.52 C 49.12 C 1,170.97 54.03 ' <br /> 4" PVC COATED GRC 80 1,534.38 C 67.50 C 1,227.50 54.00 <br /> 2" PVC CTD KO HUB CONN 4 41.78 E 56.25 C 167.12 2.25 <br /> 3" PVC CTD KO HUB CONN 5 89.76 E 62.50 C 448.80 3.13 <br /> 4" PVC CTD KO HUB CONN 2 142.39 E 75.00 C 284.78 1.50 <br /> 2" PVC/CTD GRC CPLG 12 538.26 C 0.00 C 64.59 0.00 <br /> 3" PVC/CTD GRC CPLG 12 1,618.61 C 0.00 C 194.23 0.00 <br /> 4" PVC/CTD GRC CPLG 14 2,427.80 C 0.00 C 339.89 0.00 <br /> 2" PVC/CTD 90 ELB 8 1,715.35 C 162.50 C 137.23 13.00 <br /> 3"PVC/CTD 90 ELB 8 5,164.97 C 250.00 C 413.20 20.00 <br /> 4" PVC/CTD 90 ELB 6 7,163.84 C 375.00 C 429.83 22.50 <br /> 2" PVC/CTD STRUT STRAP 12 542.21 C 16.50 C 65.07 1.98 <br /> 3" PVC/CTD STRUT STRAP 17 774.91 C 26.13 C 131.73 4.44 <br /> 4" PVC/CTD STRUT STRAP 12 900.72 C 38.50 C 108.09 4.62 <br />