Laserfiche WebLink
Harrison Avenue Stortn Sewer Replacement Engineers Estimate Bodine Services,Inc. Barr 8 Robison Sewer Entler Excavating Co.,Inc. Burdick Plumbing <br /> City Projed 2001-55 5330 E.Firehouse Road &Excavating,Inc. 819 N.Sunnyside &Heating Co.,Inc. <br /> City Engineering Division Decatur,Il 62521 2332 N.Woodford St. Decatur,IL 62522 728 South Main Street <br /> Decatur,IL 62526 Decatur,Illinois 62521 <br /> Bid Date.............Tuesday,December 11,2001 <br /> Time.....................................10:00 a.m. 5%BID BOND <br /> General Capital Fund.......................30 Apparent Low Bidder <br /> Object Code.........................42000-621 <br /> ITEM PAY ITEM UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> NUMBER <br /> 42000300 Portland CemeM Concrete Pavement,8" SY 200 $60.00 $12,000.00 $40.50 $8,100.00 $38.00 $7,600 $40.00 $8,000.00 $37.00 $7,400.00 <br /> 44000100 Pavement Removal SY 200 $20.00 $4,000.00 $9.00 $1,800.00 $8.00 $1,600.00 $5.00 $1,000.00 $9.00 $1,800.00 <br /> Manholes,Type A,4'-Diameter,Type 1 Frame, <br /> 60218400 Closed Lid EA 1 $3,000.00 $3,000.00 $900.00 $900.00 $800.00 $800.00 $1,400.00 $1,400.00 $875.00 $875.00 <br /> 60218401 Additional Depth of Manhole FT 2 $200.00 $400.00 $50.00 $100.00 $50.00 $100.00 $5.00 $10.00 $100.00 $200.00 <br /> 67100100 Mobilization EA 1 $600.00 $600.00 $350.00 $350.00 $100.00 $100.00 $300.00 $300.00 $250.00 $250.00 <br /> 70106101 TraTfic CoMrol&Protection,Standard 701501 EA 1 $200.00 $200.00 $300.00 $300.00 $350.00 $350.00 $250.00 $250.00 $400.00 $400.00 <br /> Z2080000 Selected Granular Material CY 250 $33.00 $8,250.00 $20.00 $5,000.00 $18.00 $4,500.00 $25.00 $6,250.00 $20.00 $5,000.00 <br /> Z5500000 Service Lateral Installation,4" EA 6 $400.00 $2,400.00 $250.00 $1,500.00 $150.00 $900.00 $300.00 $1,800.00 $250.00 $1,500.00 <br /> 25500008 Sewer Construdion-Pi e Sewers,8" FT 365 $45.00 $16,425.00 $16.00 $5,840.00 $23.00 $8,395.00 $25.00 $9,125.00 $27.00 $9,855.00 <br /> Z5500812 Additional Excavation De th-Pi e Sewer 8'to 12' FT 100 10.00 1 000.00 1.00 $100.00 1.00 100.00 1.00 $100.00 $10.00 $1 000.00 <br /> TOTAL BID As Correded 48 275.00 $23 990.00 $24 445.00 $28 235.00 $28 280.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 50.31 49.36 41.51 41.42 <br /> f�/�---r� J���-'" � /Z -//-U/ <br /> Matthew C.Newell,P.E.,City Engineer Date <br />