Laserfiche WebLink
, . � : <br /> October 30,2001 <br /> ENGINEERING & INFRASTRUCTURE MEMOR.ANDUM <br /> NO. 2001 - 56 I <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager ' <br /> Stephen Swanson P. E.,Director of Engineering & InfrastructurgL�y� <br /> SUBJECT: Facility Space Needs Study <br /> SUMMARY RECOMMENDATION: �' <br /> It is recommended by City staff that the City Council approve the attached resolution authorizing ��, <br /> the Mayor to execute an agreement between the City and Phillip Swager Associates far the �I <br /> Facility Space Needs Study. I <br /> BACKGROUND: <br /> The City has three major facilities which house administrative and operational functions that are <br /> experiencing the need for additional space. The facilities are the Civic Center (CC), Municipal <br /> Services Center (MSC) and the Law Enforcement Center (LEC). The City's organization, <br /> services, technology advancements, equipment and staffing have changed considerably in the <br /> time frame that each of these facilities were first occupied. These changes have resulted in <br /> nonfunctional and/or underutilized areas; the need for increased office and storage space; and the <br /> need to improve the facilities and accessibility to better serve those having to conduct business at <br /> each location. <br /> The City located its' administrative offices in the Decatur Civic Center (CC) when the facility <br /> opened in 1980. The City leases approximately 44,000 square feet of floor space on three levels <br /> in the building for its offices, storage and the City Council Chambers from the Decatur Civic <br /> Center Authority. There are a variety of space needs issues varying from storage to customer <br /> service. In addition, the City Council Chambers are limited in its existing configuration, capacity <br /> and audiovisual capabilities to best meet the needs of the City Council and the public. <br /> The City's Municipal Facilities Center (MSC) located at 2600 North Jasper Street, is <br /> experiencing space needs issues for many of the same reasons. This facility was completed in <br /> 1988 and houses the City's streets, sewers, water and fleet maintenance operations staff, <br /> equipment, materials, central fuel dispensing location and supplies. When it was designed and <br /> constructed there were budget constraints which caused changes and reductions to the facility <br /> buildings and site. The basic impact of the constraints was that the facility was built to house <br />