Laserfiche WebLink
Southtowne Sewer Improvements Engineer's Estimate Burdick Plumbing Entler Excavating Co.,Inc. Bodine Services,Inc. Barr 8 Robison Sewer , <br /> City Project 2001-42 &Heating Co.,Inc. 819 N.Sunnyside 5330 E.Firehouse Road 8 Excavating,Inc. <br /> City Engineering Division 72S South Main Decatur,IL 62522 Decatur,IL 62521 2332 N.Woodford <br /> Decatur,Illinois 62521 Decatur,IL 62526 <br /> Bid Date.............Tuesday,September 11,2001 <br /> Time.....................................10:00 a.m. 5%BID BOND <br /> General Capital Fund.......................79 Apparent Low Bidder <br /> Object Code.........................40000-668 <br /> ITEM PAY ITEM UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> NUMBER <br /> 40701400 Bituminous Concrete Pavement Full De th,T 2, SY 80 $35.00 $2,800.00 $30.00 $2,400.00 $40.00 $3,200.00 $60.00 $4,800.00 $43.75 $3,500.00 <br /> 42000536 PORland Cement Concrete Pavement,12" SY 55 $70.00 $3,850.00 $135.00 $7,425.00 $65.00 $3,575.00 $50.00 $2,750.00 $45.00 $2,475.00 <br /> 44001700 Combination Curb&Gutter Removal&Re lacement FT 40 $24.00 $960.00 $42.00 $1,680.00 $75.00 $3,000.00 $40.00 $1,600.00 $22.50 $900.00 <br /> Manholes To Be Adjusted With New Type 1 Frame, <br /> 60255800 Closed Lid EA 1 $5,000.00 $5,000.00 $600.00 $600.00 $1,250.00 $1,250.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 <br /> 70106301 Traffic Control&Protection,Standard 701601 LS 1 $7,000.00 $7,000.00 $1,800.00 $1,800.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,650.00 $2,650.00 <br /> Z1000000 B-Pass Pum in LS 1 $11,000.00 $11,000.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $8,300.00 $8,300.00 <br /> Z2080000 Selected Granular Backfill CY 165 $24.00 $3,960.00 $25.00 $4,125.00 $28.00 $4,620.00 $15.00 $2,475.00 $47.50 $7,837.50 <br /> Z5500000 Sewer Construction-Pi e Sewers 15" RCP FT 95 45.00 4 275.00 $75.00 7 125.00 120.00 11 400.00 139.00 13 205.00 145.00 13 775.00 <br /> TOTAL BID As Corrected 38 845.00 27 655.00 31 045.00 33 330.00 40 937.50 <br /> Percent Over or Under ENGINEER'S ESTIMATE 28.81 20.08 14.20 5.39 <br /> �' /��I�l <br /> � <br /> William A. Ratekin,Assis ant City Engineer Date <br />