Laserfiche WebLink
, , <br /> .Lake DQcatur Dam Rehabilitation Project Engineer's Estimate OCCI,Inc. <br /> City Project 2000-28A City Engineering Division 3200 County Rd.257 <br /> Fulton,MO 65251-3101 <br /> Bid Date..............................Tuesday,September 11,2001 <br /> Time......................................2:00 p.m. 5%BID BOND <br /> Lake Capital Fund................80 Apparent Low Bidder <br /> Object Code........................42000-882 <br /> ITEM PAY ITEM UNIT QUANTI UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> NUMBER <br /> 1 Mobilization 8�Demobilization LS 1 $50,000.00 550,000.00 $40,600.00 340,600.00 <br /> Temporary Facilities,Incidental Work& <br /> 2 Site Restoration LS 1 $35,000.00 535,000.00 $16,000.00 $16,000.00 <br /> Left River Bank&Storm Sewer Area <br /> 3a Riprap CY 190 $40.00 57,600.00 $65.00 $12,350.00 <br /> 3b Filter Fabric Material SF 2,040 a3.00 56,120.00 $3.00 $6,120.00 <br /> 3c Bedding Material CY 25 $30.00 $750.00 $110.00 $2,750.00 <br /> 3d Stilling Basin Toe Riprap CY 650 $40.00 $26,000.00 $70.00 $45,500.00 <br /> Spillway Access Platform Concrete <br /> 4a Demolition&Patching SF 8 $450.00 $3,600.00 52,000.00 $16,000.00 <br /> 4b Core Hole Plugs(4"diam.X 12") EA 3 $600.00 $1,800.00 3300.00 5900.00 <br /> 4c I-beam Removal EA 2 $1,000.00 $2,000.00 $1,500.00 a3,000.00 <br /> Crack Injection,Spillway Access <br /> 4d Platform LF 30 $120.00 $3,600.00 E450.00 a13,500.00 <br /> Training Wall Concrete Demolition& <br /> 5a Patching SF 300 3180.00 $54,000.00 $250.00 375,000.00 <br /> 5b Mud Gate Visual Inspection LS 7 $500.00 $500.00 31,200.00 a7,200.00 <br /> Spillway Overlay-Existing Horizontal <br /> 6a Joint Modification LF 700 5200.00 $140,000.00 $180.00 $126,000.00 <br /> Spillway Overlay-Existing Vertical Joint <br /> 6b Modifcation LF 105 $200.00 521,000.00 $450.00 $47,250.00 <br /> 6c Spillway Overlay-Corner Modification LF 11 3150.00 31,650.00 5500.00 $5,500.00 <br /> Spillway Overlay-New Expansion Joint <br /> 6d Placement LF 224 $120.00 $26,880.00 5550.00 5123,200.00 <br /> S1 Removal of Jammed Stoplog LS 1 318,000.00 a18,000.00 $2,400.00 $2,400.00 <br /> Stilling Basin Floor Slab Concrete <br /> S2 Re lacement SF 170 $180.00 $30,600.00 a30.00 $5,100.00 <br /> TOTAL BID As Correccted E429 100.00 E542,370.00 <br /> Percent Over or(Under)ENGINEERS ESTIMATE 26.40 <br /> (-�i �� �-- lZ O l <br /> Keith D.Alexander,Director of Water Management Date <br />