My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-151 AUTHORIZING THE EXECUTION OF A CHANGE ORDER
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-151 AUTHORIZING THE EXECUTION OF A CHANGE ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 3:19:30 PM
Creation date
1/21/2016 3:19:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-151
Res Ord Title
AUTHORIZING THE EXECUTION OF A CHANGE ORDER ION EXCHANGE NITRATE REMOVAL FACILITY
Approved Date
8/20/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� Iaiver-sified uildings, Inc. PROPOSED CHANGE ORDER <br /> , 866 N Main St NO. �003A <br /> 1 PO Box 160 Phone: 309 266-9768 <br /> Morton,IL 61550 Fax: 309 266-6553 <br /> TITLE: Remove& replace unsuitable soil DATE:6/27/O1 <br /> PROJECT:Nitrate Removal Facility JOB: 01-600 <br /> TO: Attn: Jim Robinson CONTRACT NO: <br /> Black &Veatch Corporation <br /> Decatur, IL <br /> RE: PCO To: B&V CORP From:DBI Number: 00003 <br /> DESCRIPTION OF PROP�SAL <br /> We propose to remove and replace 147 CY of soils that do not meet specified criteria for structural fill with an on-site excavated <br /> material at the Unit Cost of$39.00/CY for a Lump Sum Additon of Five Thousand Seven Hundred Thirty-Three Dollars($5733.00) <br /> per the following breakdown and including a three(3)working day extension of the Substantial Completion date in accordance with <br /> Section 00700,Article 12. <br /> Item Description Stock# Quantity Units Unit Price Tax Rate Tax AmountNet Amount <br /> 00001 Remove unsuitable soil in the 147.000 CY $15.00 0.00% $0.00 $2,205.00 <br /> lower area of the building and <br /> load into a truck <br /> 00002 Truck the unsuitable soil to an 147.000 CY $4.00 0.00"/0 $0.00 $588.00 <br /> off-site location <br /> 00003 Place and compact an on-site 147.000 CY $I 5.00 0.00°'� $0.00 $2,205.00 <br />' excavated material in the <br /> .excavated area <br /> 00004 l5%GC Margin I.000 Lot $735.00 0.00% $0.00 $735.00 <br /> Unit Cost: $5,733.00 <br /> Unit Tax: $0.00 <br /> Lump Sum: $0.00 <br /> Lump Tax: $0.00 <br /> Totai: $5,733.00 <br /> APPROVAL: <br /> By: By: �; . �� �.�,� <br /> Mark Graham � Jim Robinson <br /> Date: 6/27/O1 Date: �7��� <br /> Lxpedition� <br />
The URL can be used to link to this page
Your browser does not support the video tag.