Laserfiche WebLink
� Economic & Urban Development Department Memorandum <br /> # O 1-79 <br /> July 24, 2001 <br /> TO: Honorable M r Terry M. Howley and City Council Members <br /> FROM: Steve G ity Manager <br /> A.J. Krieger istant City Manager� <br /> SUBJECT: 300 N. Water Asbestos Abatement <br />' RECOMMENDATION: <br /> City staff recommends approval of the attached resolution accepting the bid of Acorn Industries <br /> to perform asbestos abatement in the 300 block of N. Water. Acorn Industries submitted the low <br /> bid of$51,400. City staffrecommends approval. <br /> BACKGROUND: <br /> ' ' n r cess friable asbestos must first be removed abated bef�re full scale <br /> As art of the demohtio 0 <br /> P P � � ) <br />, removal of the actual buildings can begin. Acorn Industries submitted the low bid of$51,400 for <br />', general asbestos abatement, plus Alternate #1. Alterna.te #1 provides that the asbestos abatement <br /> contractor will remove all friable asbestos, including non-friable asbestos contained in floor tiles <br /> from concrete floors. While this non-friable asbestos can technically remain in the building and be <br /> removed and disposed of as general construction waste, acceptance of the Alternate actually <br /> reduces the overall cost to the City for asbestos abatement and clean demolition. Further, it <br /> provides for removal of these concrete floor tiles under the supervision of the City's monitoring <br /> representative. <br />� As Council will recall, Blank, Wesselink, and Cook (BWC) has been retained to coordina.te the <br /> preparation of demolition related documents and supervise both the asbestos abatement and <br /> general demolition phases. BWC has subcontracted with KAM Solutions to supervise the <br /> removal of the asbestos, as well as perform all necessary site and air quality monitoring. KAM <br /> Solutions performed the original asbestos inspection, prepared the abatement bid documents, and <br /> participated in on-site pre-bid meetings. Therefore KAM is very familiaz with these buildings and <br />, the location(s) of the friable asbestos. <br /> BWC has reviewed Acorn's qualifications and experience and has recommended that the City <br /> accept its bid. A list of Acorn's experience with similar projects is attached; which includes many <br />' pro�ects much larger m s�ze and cost than the 300 block of N. Water. <br /> POTENTIAL OBJECTION: <br />' City staff is not aware of any opposition to the acceptance of Acorn's bid. <br /> INPUT FROM OTHER SOURCES: <br /> Attached to this memorandum is BWC's bid analysis and recommendation, as well as a list of <br /> Acorn's similaz project experience. <br /> STAFF REFERENCE: <br /> If Council members have questions they may contact A.J. Krieger, 424-2727, <br /> aikrie�er(a�decaturnet.org. <br /> BUDGET/TIME IMPLICATIONS: <br /> � Pending acceptance of Acorn's bid, actual asbestos abatement should begin early August and <br /> conclude on or about the end of the month. <br />