My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-97 AUTHORIZING THE EXECUTION OF AN ENGINEERING DESIGN SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-97 AUTHORIZING THE EXECUTION OF AN ENGINEERING DESIGN SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 10:39:14 AM
Creation date
1/22/2016 10:39:11 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-97
Res Ord Title
AUTHORIZING THE EXECUTION OF AN ENGINEERING DESIGN SERVICES AGREEMENT SOUTH WATER TREATMENT PLANT DIESEL GENERATOR
Approved Date
5/21/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Prepare a basis of design memorandum. The design memo will include a <br /> preliminary opinion of probable construction costs. Submit 5 copies for review <br /> by Owner's representatives. <br /> 6. Meet with Owner's representatives to discuss basis of design memorandum and <br /> opinion of probable construction cost. <br /> 7. Prepare final basis of design. Provide 2 copies for Owner's records. <br /> B. Detailed Design and Construction Documents <br /> 1. Design and prepare 60 percent complete construction drawings and technical <br /> specifications. Submit 5 sets for review by Owner's representatives. <br /> 2. Meet with Owner's representatives to discuss comments. <br /> 3. Meet with Owner's representative to discuss and obtain the following information <br /> needed to complete the Contract Documents. <br /> . Bidding Requirements <br /> Advertisement for Bid <br /> Instructions to Bidders <br /> . Bid Forms <br /> Bid Form <br /> Bid Bond <br /> Questionnaire <br /> . Owner's Forms <br /> Noncollusion Affidavit <br /> Final Waiver of Lien <br /> . Contract Forms <br /> Agreement <br /> Construction Performance Bond <br /> Construction Payment Bond <br /> Certificate of Insurance <br /> Certificate of Property Insurance <br /> Notice of Award <br /> Notice to Proceed <br /> Change Order <br /> . Conditions of Contract <br /> General Conditions <br /> Supplementary Conditions <br /> . Division 1 —General Requirements <br /> Section 01015 —Project Requirements <br /> 4. Prepare 90 percent complete construction documents. Submit five sets for review <br /> by Owner's representatives. <br /> 5. Prepare final opinion of probable construction cost. <br /> 6. Meet with Owner's representative to discuss comments and cost estimate. <br /> 7. Complete construction documents. Submit two copies for Owner's files and for <br /> use when printing bidding documents. <br /> 8. Prepare Advertisement for Bidding and submit to Owner. <br /> Decatur,111. �l-2 <br /> South WTP <br /> 1,750 kW Generator Addition <br /> 04/04/Ol <br />
The URL can be used to link to this page
Your browser does not support the video tag.