Laserfiche WebLink
,, , <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> N0.2001-23 <br /> May 1, 2001 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager � <br /> Stephen P. Swanson,Director of Engineering & Infrastructure�� T <br /> Matthew C. Newell, City Engineer�1ti'1il <br /> Kris G. Quandt, Civil Engineer Y�� <br /> ✓� <br /> SUBJECT: Roadway/Utility Easement Purchase from East Park Baptist Church <br /> City Project 9838 Drainage Area 30 (Albany/Fulton) Storm Drainage <br /> Improvements <br /> SUMMARY RECOMMENDATION: <br /> Staff recoinmends that the City Council approve the attached resolution authorizing the payment <br /> of$13,000 for the purchase of a roadway/utility easement totaling approximately 1.5 acres from <br /> the East Park Baptist Church located at 1919 South Baltimore Avenue. The acquisition of this <br /> roadway/ utility easement is necessary for the improvement of storm drainage in Drainage Area <br /> 30, located around the Albany/Fulton neighborhood. <br /> BACKGROUND: <br /> On December 7, 1998, the City Council authorized the design of storm drainage improvements <br /> for the area generally south east of the intersection of Albany / Fulton Streets. The proposed <br /> design of these improvements have been largely completed and the City is now in the process of <br /> acquiring right of way to provide an outfall for the area storm drainage. <br /> The attached drawing details the proposed design along with the right of way requested to be <br /> purchased from the East Park Baptist Church. Storm drainage in the area has a logical outfall to <br /> the southwest as delineated by the storm drain system proposed by this project. The roadway / <br /> utility easement desired for this work is in essence the east half of Albany Street from Maryland <br /> Street to Orchard Street and the south half of Maryland Street from Albany to Montrose Street. <br />