My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-84 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-84 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 11:09:51 AM
Creation date
1/22/2016 11:09:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-84
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT GARY DRIVE STREET CONSTRUCTION
Approved Date
5/7/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`` a <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2001-22 <br /> May 07,2001 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager � <br /> Stephen P. Swanson,P.E.,Director of Engineering& Infrastructur�'�" � <br /> Matthew C. Newell,P.E., City Engineer��C <br /> Kris G. Quandt, E.I.T., Civil Engineer�2�— <br /> SUBJECT: Gary Drive Street Reconstruction City Project 2000-33 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the i <br /> contract for Gary Drive Street Reconstruction, City Project 2000-33, to Otto Baum, Inc., in the <br /> amount of$189,353.10, and that the Mayor be authorized to execute the contract, and the City <br /> Clerk to attest. j <br /> BACKGROUND: II! <br /> This work need is generally the result of normal pavement maintenance and repair. This will be <br /> accomplished by replacing the concrete pavement, as well as the curb and gutter, and driveways. <br /> Alternate #1 was selected using the Illinois Department of Transportation method of life cycle <br /> cost comparison of Portland Cement Concrete verses the Asphalt Concrete alternate with the bids <br /> received. <br /> The project plans and specifications were prepared by City staff. The project was advertised <br /> Apri14, 2001, and bids were opened on Apri124, 2001. The results for the letting are as follows: <br /> ALTERNATE #1(P.C.C. Pavement): <br /> Compared to <br /> Engineer's Est. , <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $293,935.00 ----- �� <br /> Otto Baum Company Inc. $189,353.10 (35.58%) I <br /> Entler Excavating Co.,Inc. $201,085.75 (31.59%) �I <br /> Christy-Foltz,Inc. $227,083.00 (22.74%) �, <br />
The URL can be used to link to this page
Your browser does not support the video tag.