Laserfiche WebLink
PUBLIC CONCERN BACKGROUND INFORMATION ESTIMATED ESTIMATED� '- �, <br /> AND CORRECTNE ACTION TO BE TAKEN FUTURE TIME � <br /> CITY COST FRAME �' <br /> C. The construction of the BACKGROLTND INFORMATION: Prior to the original construction, the general <br /> original storage site altered surface water flow at the site was from south to north with three main outlets—one � <br /> the overall storm drainage near the east end of the site,one near the center of the site,and one near the west end <br /> patterns from the drainage of the site. After construction, the flow through the east outlet was significantly <br /> patterns that existed prior to increased, the flow through the center outlet was significantly decreased, and the flow <br /> construction of the site. through the west outlet was moderately decreased. <br /> CORR�CTNE ACTIONS TO BE TAKEN: During the construction for the reuse of No additional 2001-2002 <br /> the storage site,new drainage outlet structures will be placed at various locations along cost—included <br /> the perimeter berms to allow storm water to flow into the original east,center, and west in site reuse <br /> surface drainage outlets. Grading will be done within the perimeter berms to restore as construction <br /> closely as possible the pre-existing drainage patterns. Limited grading will be done costs <br /> prior to the start of the Basin 6 dredging operation,with the remainder of the grading <br /> to be completed when the sediment has dried enough to support the weight of <br /> earthmoving equipment. <br /> D. The fencing and gates BACKGROLJND INFORMATION: A four-foot high woven wire fence with two <br /> installed for the original strands of barbed wire,with gates at various locations,was installed along the entire <br /> storage site have not been perimeter of the original storage site. There are several small locations where the gates <br /> properly maintained. and fencing have been removed for mowing and farming access. Currently, some of <br /> the gates are kept locked at all times and some are not. <br /> . CORRECTNE ACTION TO BE TAKEN: Fencing and gates will be repaired when No additional 2001-2002 <br /> construction begins to reuse the site. Fencing will be maintained in good repair and cost—included <br /> gates will be kept locked at all times except when needed for maintenance or farming in site reuse <br /> operations. Gate keys will be provided to the Macon County Sheriff's Department and construction <br /> the City of Decatur Police Department for emergency access. costs <br /> E. The site has not been BACKGROUND INFORMATION: Prior to the year 2000,the City mowed the berm <br /> mowed as often as needed and the areas outside of the perimeter berm only one time per year,per USDA NRCS <br /> and noxious weeds have not wildlife enhancement recommendations,and noxious weeds were minimally controlled <br /> been controlled. in some areas of the site. <br /> CORRCC"I'1VE ACTION TO I3L'TAKLN: The City will maintain the schedule tlley $14,000 2001-2010 <br /> established in 2000 of mowing the berms and outside the berms four times per year. If annually <br /> the mowing program does not control the noxious weed growth,herbicide will be <br /> applied by licensed ersonnel as re uired. <br /> Page 2 of 4 <br />