Laserfiche WebLink
SKS ENGINEERS, INC. ATTACHMENT 1 - WORK PLAN'AND ESTIMATE OF FEES <br /> City of De�atur- City Project No. _ Staffinq & Cost Estimate Expenses Comments <br /> COtJNTRY MANOR SUBDIVISION STREET AND <br /> DRAINAGE IMPROVEMENT $100 $100 $75 $45 $60 $35 $108 $60 $0 $27 <br /> SKS Pro'ect No. 18039 Krimmel Shaffer L nch Zei ler Surve Junior Two Man Senior Total <br /> APRIL 3,2001 Pro'ect Pro'ect Pro'ect CADD Pa En r Surve Materials Total Labor Print Plot <br /> Item No. Item Descri tion M r. Consultant En r Draftsman Chief Tech rew Tech Clerical Hours Cost <br />, ,1 Initial Investi ation 8�Prelimina Re o�t Initial site recon,site research,initial conferences <br /> ith City Staff,project set up. <br /> 1.1 Site Recon 2 4 2 <br /> 1.2 Initial avement research 4 <br /> 1.3 Prelimina Estimates 2 <br /> 1.4 Conferences Ci Staff 2 2 <br /> Person Hours 4 12 2 0 0 0 0 0 0 0 18 <br /> Personnel Cost 400.00 1200.00 150.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1,750 ' <br /> ompile existing information available from I <br /> 2 Com ile and Review Existin Data ubdivision"As BuilY'plans,other City records <br /> inGuding aerial photos. Street Alignment,sewer and I <br /> ater mains locations,and services taps in areas <br /> 2.1 Subdivision As Built Plans 2 8 8 '� <br /> affected by proposed underground construction. Public <br /> 2.2 Ci Records-Public Utili Records 2 8 8 meeting with residences. I <br /> 2.3 Resident input 8 8 8 , <br /> 2.4 Field Recon 2 2 <br /> Person Hours 14 8 10 16 16 0 0 0 0 0 64 I! <br /> Personnel Cost 1400.00 800.00 750.00 720.00 960.00 0.00 0.00 0.00 0.00 0.00 $4,630 '� <br /> �Field Survey to verify As Built and record data and '� <br /> 3 Field SuNe to supplement record data-Pavement patching r- �I <br /> survey. Driveway locations. Possible survey of � <br /> 3.1 Veri Record Data 4 16 rainage way. <br /> 3.2 Su lement Record Data-Ditch Surve 4 16 <br /> 3.3 Patchin Surve 16 <br /> 3.4 Field Recon 4 <br /> Person Hours 0 0 12 0 0 0 32 16 0 0 60 <br /> Personnel Cost 0.00 0.00 900.00 0.00 0.00 0.00 3456.00 960.00 0.00 0.00 $5,316 <br /> 4 Develo 68Se Sheets Develop base maps and drawings from record and <br /> urvey data for design plans. Aerial Photo fumished by <br /> 4.1 Overall site lan 2 4 12 <br /> he city will be used in report preparation. <br /> 4.2 Base Ma s for Stud 2 4 12 <br /> Person Hours 4 0 8 24 0 0 0 0 0 0 36 <br /> I Personnel Cost 400.00 0.00 600.00 1080.00 0.00 0.00 0.00 0.00 0.00 0.00 $2,080 <br /> Define drainage areas and compute runoff and make <br /> 5 Dfaina e Stud recommendatios for strom sewer improvements. This <br /> may require impoorvements to ditch. <br /> 5.1 Com utations 2 20 <br /> 5.2 Storm Sewer Recommendations 2 20 <br /> Person Hours 4 0 40 0 0 0 0 0 0 0 44 <br /> Personnel Cost 400.00 0.00 3000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $3,400 <br /> Research use of PCC or Bit.Conc.Overlay/repair,make <br /> 6 Pavement Rehab Recommendations mparative cost estimates. <br /> 6.1 Research PC Concrete o tions 8 <br /> 6.2 Research Bituminous concrete O tions 8 <br /> 6.3 Com arative Cost Estimates 8 <br /> Person Hours 0 24 0 0 0 0 0 0 0 0 24 <br /> Personnel Cost 0.00 2400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $2,400 <br /> Prepare Engineer's Estimate of probable cost along with <br /> � 7 En ine2�n Re ort and Estimate report of recommendations. Meet with city staff for final <br /> ecision. <br /> 7.1 Re ort and Estimate 8 4 8 8 g <br /> ; Person Hours 8 4 8 8 0 0 0 0 0 8 36 <br /> ; Personnel Cost 800.00 400.00 600.00 360.00 0.00 0.00 0.00 0.00 0.00 216.00 $2,376 $21,952 $21,952 <br /> � <br />