Laserfiche WebLink
, , � . . , . <br /> AGREEMENT FOR ENGINEERING DESIGN SERVICES - <br /> FOR THE <br /> CITY OF DECATUR <br /> SOUTH ELEVATED WATER STORAGE TANK <br /> � <br /> THIS AGREEMENT, made and entered into this ��� day of r�--� , 2001, by and <br /> between the CITY OF DECATUR, ILLINOIS, hereinafter referred to as the "CITY" and <br /> BAINBRIDGE, GEE, MILANSHI & ASSOCIATES, INC., 1670 South Taylorville Road, <br /> Decatur, Illinois 62521, hereinafter refeired to as the"ENGINEER", covers professional engineering <br /> services in connection with the preparation of plans and specifications for the improvements <br /> hereinafter referred to as the "PROJECT". <br /> Said PROJECT has been designated CITY PROJECT 9735 and includes the siting and design of <br /> a new elevated water storage tank in the southern section of the City. <br /> THEREFORE, in consideration of these premises and of the mutual covenants herein set forth, <br /> THE ENGINEER AGREES: <br /> 1. To perform or be responsible for the performance of the following engineering services: <br /> a. Meet with the CIT'Y staff to discuss the purpose of the new water tower, tower I' <br /> capacity, secondary benefits, different styles, related equipment, relative costs and <br /> preliminary site selection. 'i <br /> b. Deternune the physical property constraints of potential sites. After a site is selected, <br /> the ENGINEER will have soil borings taken and have prepared a geotechnical soils <br /> report of the suitability of the site for a tower foundation. <br /> c. The impacts of the new tower on the distribution system will be checked by Strand <br /> using the CITY'S current hydraulic model. <br /> d. Determine which utilities if any need to be modified or e�ended to serve the selected <br /> site. <br /> e. Review zoning and other regulatory requirements such as IEPA and Federal Aviation <br /> Administration requirements for the selected site. Prepare all necessary permit <br /> applications on behalf of the CITY. <br />' f. Prepare detailed construction drawings, specifications and contract bidding <br /> documents. <br /> g. Prepare detailed estimates of construction cost based on final plans and documents. <br /> h. Submit plans and specifications to the CIT'Y for review and approval. <br /> i. Review construction bids and prepare recommendation for contract award. <br /> BGM 01-038 Page 1 of 5 <br />