My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-57 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-57 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 2:38:42 PM
Creation date
1/22/2016 2:38:41 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-57
Res Ord Title
AUTHORIZING AGREEMENT - LDR INTERNATIONAL, INC. - URBAN DESIGN SERVICES
Approved Date
4/2/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Products <br /> We have outlined a summary of anticipated work products below. All plans <br /> and sketches will be provided in color. <br /> Central Park <br /> • Three draft concept alternatives (50 scale) <br /> • One Illustrative Site Plan (20 scale) (hard copy plus scanned version <br /> L�� with one copy provided at 8.5" x 11") <br /> • Preliminary estimate of probable cost <br /> terna�on • Summary memorandum on selected concept (2-3 pages) <br /> AN HNTB � oMPAN � • Oneperspectivesketch <br /> Civic Center Site <br /> • Two draft concept alternatives (50 scale) <br /> • One Illustrative Site Plan (50 scale) (hard copy plus scanned version <br /> with one copy provided at 8.5" x 11") <br /> • One colored perspective sketch (hard copy plus scanned version with <br /> one copy provided at 8.5" x 11") <br /> • Preliminary estimate of probable cost <br /> • Summary memorandum on selected concept (2-3 pages) <br /> Meetings and Schedule <br /> We have included two trips to Decatur to meet with city officials and staff to <br /> present the concepts prepared. We assume that visits will include one full day <br /> in Decatur: (I will typically fly in the night before the meeting and depart at <br /> the end of the meeting day.) We assume that our work for the project will be <br /> conducted over a 2-3 month period. <br /> Remuneration <br /> We will complete work outlined above for a total lump sum budget of <br /> $26,500. We have outlined our budgeted estimate of fees below for your <br /> review. We have included one meeting per area for a total of two meetings. <br /> Budget Estimate for Professional Fees <br /> Area 1 Central Park $16,100 <br /> Area 2 Civic Center $10,400 <br /> Total Proposed Fees $26,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.