Laserfiche WebLink
FY-2001 <br /> - FEDERAL TRANSIT ADMINISTRATION - <br /> TOTAL FTA FUNDS AVAILABLE: $956,957 <br /> FY-2001 OPERATING PROGRAM <br /> FTA FUNDS AVAILABLE: $700,000 <br /> FY-2001 CAPITAL PROGRAM <br /> FTA FUNDS AVAILABLE: $256,957 <br /> TOTAL CAPITAL FUNDS AVAILABLE: $321,197 <br /> ($256,957 FTA - $64,240 STATE OR LOCAL MATCH) <br /> COST ITEM <br /> FTA-MATCH <br /> $165,913 MULTI-MODAL TRANSPORTATION FACILITY <br /> $132,730-$33,183 Construction of the buildin and develo ment of the facilit site. <br /> $40,000 SERVICE TRUCK <br /> $32,000- $8,000 5-Ton truck(approx.) able to tow buses, with crane, air compressor, front <br /> winch, " uick-start" unit,rear tow bum er and front ush bum er. <br /> RADIO SYSTEM <br /> $38,000 g00 Mhz trunked radio system linked to City's E911 dispatch system, <br /> $30,400-$7,600 including mobile radios with handsets for each revenue vehicle and each <br /> service truck,portable radios for each supervisor's vehicle, and 3 control <br /> stations. <br /> $8,000 MAINTENANCE EQUIPMENT <br /> $6,400- $1,60o Vehicle air conditionin service center. <br /> $15,000 FUELING STATION CANOPY <br /> $12,000-$3,000 40' long canopy over the fueling station, extending part way over the bus <br /> lane, with a wind-break wall on the western side. <br /> REPAIR/LTPGRADE BUS WASHER <br /> $25,000 Replace washer brushes, replace valves with anti-hammer valves, add under <br /> $20,000- $5,000 washer unit and wheel washer, and add supplemental pump for wheel <br /> washer. <br /> $26,000 SIGNS & SHELTERS <br /> $20,800- $5,20o Purchase signs and posts to replace all bus stop signs, and purchase <br /> additional shelters and re lacement shelter sections. <br /> $3,284 SIDEWALK REPLACEMENT <br /> $2,627-$657 Remove plantings and replace sidewalk around front of Transit <br /> Administration Buildin . <br /> $321,197 TOTAL COST <br /> $256,957-�64,240 FTA-MATCH <br />