Laserfiche WebLink
1 were two storm sewer systems, and I heard you <br /> 2 explain three . <br /> 3 MR. PHIL COCHR.AN: There are only two storm <br /> 4 sewer systems . Presently, the storm -- one storm <br /> 5 sewer system is over land drainage which takes place <br /> 6 for the majority of the parcel . The second storm <br /> 7 sewer system is the storm sewer system on the Mound <br /> 8 School site, both the parking lot for the parking <br /> 9 areas around the buildings, and they drain into a <br /> 10 storm sewer and go into the IDOT right-of-way, an <br /> 11 underground system. Those are the two existing <br /> 12 storm sewer systems : One overland drainage and one <br /> 13 underground into IDOT . <br /> 14 COMMISSIONER NABER: There was one that was <br /> 15 going to be moved west . <br /> 16 MR. PHIL COCHR.AN: That ' s a sanitary sewer. <br /> 17 We will move the sanitary sewer to the west so the <br /> 18 building won' t be over the top of it . <br /> 19 COMMISSIONER NABER: Thank you . <br /> 20 MR. SHARPE : Mr . Massie, so, what I <br /> 21 understand is that the picture with the green trees, <br /> 22 and everythinq, that represents actual trees, not <br /> 23 just to color it up; is that correct? <br /> 24 MR. KENT MASSIE : There have been so many of <br /> 24 <br />