Laserfiche WebLink
� S <br /> Summary of Engineering Costs <br /> Phase/ Estimated <br /> Treatment Item Estimated Schedule Engineering <br /> Train Costs <br /> I - East Desi n 2016 - 75%, 25% -2017 $ 545,000 <br /> I - East Biddin 2017 $ 26,000 <br /> I - East Construction 2018 $ 266,000 <br /> I/II SRF Loan Assistance 2016 $ 34,000 <br /> Total $ 871,000 <br /> A8 <br />