Laserfiche WebLink
` w.s9���n �`$�� �5'���Lm v..2F3 <br /> EXHIBIT 2 <br /> Project Costs <br /> FirsTech Busey <br /> SITE <br /> Site Construction (includes infill and paving) $150,000 <br /> Demo of FirsTech Building $200,000 <br /> Demo Auto Bank $50,000 <br /> Sub-Total $350,000 $50,000 <br /> BUILDING <br /> Remodel Dewitt(7,700 sf @ $125/s fl $962,500 <br /> Finish Upgrade for Plaza 2"d Floor(5,500 sf @ $50/s� $275,000 <br /> Structural Upgrade for Plaza ls`Floor(2,700 sf @ $15/s fl $40,500 <br /> Drive Up Construction $250,000 <br /> Paving $100,000 <br /> Teller Remodel $25,000 <br /> Sub-Total $1,278,000 $375,000 <br /> CONTINGENCY <br /> Design Contingency $80,000 $20,000 <br /> Bid Contingency $80,000 $20,000 <br /> Construction Contingency $80,000 $20,000 <br /> Sub-Total$240000 $60,000 <br /> TOTAL $1,868,000 $485,000 <br /> ARCHITECTURAL FEES/COSTS <br /> ArchitecdEngineering Design Fees $156,500 $48,500 <br /> Additional Site Observation $2,500 $2,500 <br /> Reimbursable Expenses: <br /> Document Printing $2,500 $2,500 <br /> Construction Testing $2.500 $2.500 <br /> TOTAL $164,000 $56,000 <br /> OTHER COSTS <br /> Technology/Telecom � $360,000 $185,000 <br /> Furnishings/Fixtures $150,000 <br /> Drive-Up Equipment $25,500 $11,500 <br /> TOTAL $535,500 $241,500 <br /> OVERALL TOTALS $2,567,500 $782,5000 <br /> TOTAL PROJECT COST: $3,350,000 <br /> CITY OF DECATUR/FirsTech Red.Agreement 24 <br /> Page 124 of 161 <br />