Laserfiche WebLink
the accumulation of garbage, junk, rubbish or trash constitutes a danger to the <br /> health, safety or welfare of individuals in the area or the public at large. <br /> * * * <br /> Chapter 63: <br /> 13. SITE PLAN REQUIRED. No person, firm or corporation shall lay <br /> out, establish, develop, improve, construct, substantially alter, extend or enlarge a <br /> mobile home park in the City of Decatur, or within one and one-half miles of the <br /> corporate limits thereof, unless and until a site plan of said mobile home park has <br /> been approved by the Directors of Public Works and <br /> Economic and Urban Development and a site development bond in conformance <br /> with the provisions of the Building Ordinance has been furnished to the City. <br /> 14. REVIEWING FEE. Three copies of all mobile home park site plans <br /> required by the provisions hereof shall be submitted to the �ep���r� <br /> Economic and Urban Development Department <br /> together with a reviewing fee of$150.00. <br /> 15. SITE PLAN REQUIREMENTS. Mobile home park site plans shall <br /> be in such scale, detail and format as may reasonably be required by the Directors <br /> of Public Works and Economic and Urban <br /> Development to enable such departments to administer the provisions hereof, and <br /> at a minimum shall show the layout, location, relationship, grades, contours and <br /> dimensions of all property lines, lots,buildings, streets, sidewalks, utilities, drains, <br /> surface water drainage, parking facilities, drives, easements, fire hydrants, area <br /> lighting, and other improvements and structures all in conformance as near as may <br /> be with those provisions of similar nature of the Subdivision Ordinance. <br /> 16. APPROVAL OF SITE PLAN. The approval of the mobile home <br /> park site plan and the acceptance by the City of the site development bond as <br /> required herein shall constitute authority to layout, establish, develop, improve, <br /> construct, substantially alter, extend or enlarge such mobile home park in <br /> accordance with the site plan thereof approved; however, no mobile home may be <br /> placed on any lot within said park, or if developed in phases on any lot within any <br /> phases thereof, until as-built plans certified by a Registered Professional Engineer <br /> have been filed with the Economic and <br /> Urban Development Department and a Certificate of Occupancy obtained <br /> therefrom. <br /> * * * <br />