Laserfiche WebLink
K X <br /> • � _ , � � <br /> � f • M <br /> t � <br /> or affiliate of such large user, such construction shall be at the sole <br /> cost of ADM, and ADM shall be solely responsible for its <br /> operation and maintenance. <br /> (h) In the event that ADM shall desire to use the City's existing mains <br /> along Rea's Bridge Road and/or Brush College Road to deliver <br /> industrial cooling and process water from the North Plant to <br /> ADM's East or West plants, ADM shall cause to be installed, at its <br /> cost, replacement potable water mains for the City of design and <br /> specifications approved by the City in writing prior to construction. <br /> (i) Under no circumstances shall ADM produce at the North Plant <br /> finished water for domestic use. <br /> 7. U�grade Work Before Closing. After execution of this Agreement and prior to <br /> Closing, ADM may commence upgrade work at the North Plant, under the following terms and <br /> conditions: <br /> (a) The design and scope of such upgrade work shall be subject to the <br /> City's prior written approval. , <br /> (b) ADM shall obtain all necessary permits far such work. il <br /> (c) No such work by ADM shall interfere with the normal operation <br /> and use of the North Plant by the City or interrupt the City's water <br /> service prior to Closing. <br /> (d) All such work shall be at ADM's cost. <br /> (e) In the event that the Closing shall not occur, ADM at its cost sha11 <br /> remove all equipment and facilities that it shall have installed and <br /> -6- <br />