My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-75 REZONING PROPERTY
COD
>
City Clerk
>
ORDINANCES
>
1997
>
97-75 REZONING PROPERTY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2016 4:14:08 PM
Creation date
3/16/2016 4:14:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
97-75
Res Ord Title
REZONING PROPERTY - 1267-1287 WEST KING STREET AND 12-68-1278 WEST GREEN STREET
Approved Date
8/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Mayor and City Council , <br />' August 13, 1997 ' <br /> Page Two <br /> With regards to the specific Planned Unit Development submitted with this request, staff is of the <br /> opinion that it provides for an acceptable transition between commercial and residential use. A <br /> landscaped setback area of fifteen to thirty feet will be provided along the east side of the <br />' premises adjoining residential property fronting on Green Street. A landscaped strip of eight to <br /> twent feet would be rovided alon the e i f h <br /> y p g ast s de o t e premises ad�ommg residential property <br /> fronting on King Street with an additional twenty-six feet east of the landscaped area being used I <br /> for construction of an alley to connect the existing east-west alley to King Street. A sight break I <br /> fence would also be constructed along the east side of the premises. The actual commercial I <br /> building would be located a minimum of seventy feet from the east property line, which adjoins i <br /> residential development. � <br /> With regards to infrastructure to serve this development, both City of Decatur water and sanitary <br />� sewer utilities are available; storm water detention will be provided on site with discharge into <br /> existing systems along Green Street. No improvements to the existing adjoining streets are <br /> necessary except for construction to accommodate proposed driveways. <br /> In view of the data presented, staff recommends approval of the petition with the following <br /> stipulations: (1) that the proposed development be in accordance with petitioner's plans, (2) that <br /> prior to issuance of any building permits, complete plans including but not limited to <br /> watermains, sanitary sewers, storm sewers, parking lots, landscaping, and signage be submitted <br /> to and approved by the Departments of Community Development and Public Works, and further <br /> that right-of-way be dedicated for the proposed north-south alley, which is to be an asphalt <br /> surface a minimum of ten feet in width, that easements be granted to the City of Decatur for <br /> relocating the existing sanitary sewer within the subject premises, and that vehicular access <br /> permits to Fairview Avenue be obtained from the State of Illinois Depaztment of Transportation. <br /> A copy of the Plan Commission minutes regarding this matter is included in the packet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.