Laserfiche WebLink
'r �• ~ . <br /> �. � . <br /> � <br /> SCOPE OF SERVICES � <br />� Pin &Link Replacement <br /> Garfield Street Bridge over 22"d Street <br />� (1) Search data for details of pin and link elimination <br /> (2) Perform structural analysis to determine forces in pin and link <br /> (3) Design new link plate in accordance with AASHTO Specifications <br /> (4) Draft details of new pin and link assembly in accordance with details and notes included in <br /> Section 1.11 of the IDOT Structural Services Manual <br /> (5) Develop general details for supporting the suspended span. Specific details for the temporary <br /> support system are typically to be submitted by the contractor for review and approval. <br /> (6) Develop cost estimate and special provisions <br /> (7) Prepare traffic control plans if traffic staging will be required during pin and link replacement <br /> (8) Prepare bid documents <br /> (9) Review shop drawings and temporary support system details <br />