Task 5. Review of the findings. Once all of the results have been gathered, an analysis <br /> of the information will be conducted to determine what parts of the model should be <br /> changed, which parts of the model are acceptable as is, and finally, if the model will <br /> adequately predict water level declines This effort will include an assessment of the data <br /> to determine if the information available to the modelers was/is accurate enough to allow <br /> for the acceptable completion of ground-water flow model (i.e., do we know enough <br /> about the connections between aquifers?). <br /> Task 6. Develop a report of the findings and recommendations. A contract report <br /> will be developed that will describe all of the effort in the preceding five tasks, due at the <br /> end of the project. A technically reviewed draft of the report will be available to the City <br /> of Decatur eight weeks after the model code and data are made available to the ISWS. <br /> The report will include recommendations for further action by the City to better <br /> understand and predict impacts from pumpage of their emergency well field. If the <br /> project were to start on August 1, 2000 as proposed, the draft contract report would be <br /> available to the City on or before September 26, 2000 and the published contract report <br /> would be available on or before November 30, 2000. In addition, staff of the ISWS will <br /> be available to meet with the City of Decatur to present and discuss the results of their <br /> findings. <br /> Experience & Past Investigations <br /> The ISWS has a strong background in modeling and in assessment of the Mahomet I <br /> aquifer. Mark Anliker from the ISWS has completed 2 reports for the Mahomet Valley Water <br /> Authority in the area around the emergency well fields that detail water levels and the hydraulic <br /> conditions that are cunently known. In Mark's 2"d report, he outlines a plan for developing a <br /> long-term observation well network that would provide important new data on the geology and <br /> water levels in the area. Steve Wilson, George Roadcap, and others completed a multi-year <br /> study for the Long Range Water Plan Steering Committee in the McLean-Tazewell counties <br /> region that included the development of a sophisticated 3D ground-water flow model that will <br /> predict drawdown in the Mahomet aquifer and in the two shallower aquifers identified in that <br /> region. That study was a benchmark study for the ISWS that has served as the example of the <br /> approach needed for conducting large ground-water resource investigations. <br /> Recently, George Roadcap sent the City of Decatur a letter concerning the RFP for this <br /> proposal. In that letter, George identified some concerns regarding the current ground-water <br /> flow model and the approach taken to develop that model. This "initial investigation" provided <br /> the impetus to develop this proposal. The ISWS is uniquely qualified to conduct this study for <br /> several reasons. First of all, most of the data in the original model (10 of the 13 references and <br /> many other personal contacts during the development of the model) came from the ISWS. For <br /> example, the interpretation of the water level data used as the calibration target was completed by <br /> the ISWS and provided to LGI. Secondly, a review of our public files reveals that there may be <br /> 4 <br />