My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-222 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-222 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 10:32:14 AM
Creation date
3/29/2016 10:32:12 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-222
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES ION EXCHANGE TREATMENT FACILITY CONSTRUCTION PHASE - CITY PROJECT 9953
Approved Date
11/6/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following topics will be included: <br /> Chapter 1 —Introduction <br /> A. Treatment Requirements <br /> B. Description of Unit Processes <br /> Chapter 2 - Operational Consideration <br /> A. Nitrate Ion Exchange and Regeneration <br /> Chapter 3 -Equipment Operation <br /> A. IX Feed Pumps <br /> B. Ion Exchange Units <br /> C. Rinse Pumps _ <br /> D. Compressed Air System <br /> E. Flow Measurement and Monitoring <br /> F. Chlorine Residual Analyzer <br /> G. Fluoride Residual Analyzer <br /> Chapter 4 - Chemical Feed Systems <br /> A. Dechlorination Chemical Feed System <br /> B. Caustic Soda Feed System <br /> C. Salt Brine Storage and Feed System <br /> D. Fluoride Feed System <br /> Chapter 5 -Electrical System <br /> A. General <br /> B. 600 Volt Motor Control Centers (MCCs) <br /> C. Lighting Panels <br /> Chapter 6 -Laboratory Controls <br /> A. General <br /> B. Sampling& Testing program ; <br /> C. Application of Analyses ! <br /> D. Worksheets <br /> Chapter 7—Equipment Maintenance <br /> A. Equipment Data <br /> B. Preventive Maintenance Program <br /> C. Spare Parts Inventory <br /> B. Prepare a compilation of Part 2 -Manufacturers' Maintenance Manuals,which will <br /> include a collection of the operation and maintenance manuals supplied by the <br /> manufacturers of the equipment. The manuals will be reviewed by the Engineer for <br /> completeness. Three copies of the manuals will be delivered to the Owner. One copy <br /> A-8 <br /> City of Decatur SWTP <br /> 10/26/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.