Laserfiche WebLink
The following topics will be included: <br /> Chapter 1 —Introduction <br /> A. Treatment Requirements <br /> B. Description of Unit Processes <br /> Chapter 2 - Operational Consideration <br /> A. Nitrate Ion Exchange and Regeneration <br /> Chapter 3 -Equipment Operation <br /> A. IX Feed Pumps <br /> B. Ion Exchange Units <br /> C. Rinse Pumps _ <br /> D. Compressed Air System <br /> E. Flow Measurement and Monitoring <br /> F. Chlorine Residual Analyzer <br /> G. Fluoride Residual Analyzer <br /> Chapter 4 - Chemical Feed Systems <br /> A. Dechlorination Chemical Feed System <br /> B. Caustic Soda Feed System <br /> C. Salt Brine Storage and Feed System <br /> D. Fluoride Feed System <br /> Chapter 5 -Electrical System <br /> A. General <br /> B. 600 Volt Motor Control Centers (MCCs) <br /> C. Lighting Panels <br /> Chapter 6 -Laboratory Controls <br /> A. General <br /> B. Sampling& Testing program ; <br /> C. Application of Analyses ! <br /> D. Worksheets <br /> Chapter 7—Equipment Maintenance <br /> A. Equipment Data <br /> B. Preventive Maintenance Program <br /> C. Spare Parts Inventory <br /> B. Prepare a compilation of Part 2 -Manufacturers' Maintenance Manuals,which will <br /> include a collection of the operation and maintenance manuals supplied by the <br /> manufacturers of the equipment. The manuals will be reviewed by the Engineer for <br /> completeness. Three copies of the manuals will be delivered to the Owner. One copy <br /> A-8 <br /> City of Decatur SWTP <br /> 10/26/00 <br />