Laserfiche WebLink
D. Provide up to 10 days of startup services consisting of an initial3-day site visit <br /> followed by two 2-day visits for additional consultation. The remaining three days <br /> will be held in reserve to provide additional startup services, if necessary. <br /> TASK 10. RECORD DRAWINGS. <br /> Upon completion of the project, revise the construction contract drawings to conform to <br /> the construction records. Submit the electronic construction record drawing files in <br /> AutoCAD format on a CD ROM, and one set of Mylar reproducible drawings. <br /> SUPPLEMENTAL SERVICES <br /> A. Any work requested by Owner that is not included in one of the items listed in any <br /> other task will be classified as supplemental services. <br /> B. Supplemental services shall include,but are not limited to: <br /> 1. Additional meetings with local, State, or Federal agencies to discuss the project. <br /> 2. Additional appearances at public hearings or before special boards. <br /> 3. Supplemental engineering work required to meet the requirements of regulatory <br /> or funding agencies that become effective subsequent to the date of this <br /> agreement. <br /> 4. Observing factory tests and field retesting of equipment that fails to pass the <br /> initial test. <br /> 5. Services for making revisions to drawings and specifications made necessary by <br /> the acceptance of substitutions proposed by the Contractor; and services after <br /> the award of contract for evaluating and determining the acceptability of <br /> substitutions proposed by the Contractor. <br /> 6. Services resulting from significant delays, changes, or price increases caused <br /> directly or indirectly by shortages of materials, equipment, or energy. <br /> 7. Additional or extended services during construction made necessary by (1)work <br /> damaged by fire or other cause during construction, (2) a significant amount of <br /> defective or neglected work by any Contractor, (3) acceleration of the progress <br /> schedule involving service beyond normal working hours, (4) default by any <br /> Contractor, and (5)failure of the Contractor to complete the work within the <br /> construction contract time. <br /> A-10 <br /> City of Decatur SWTP <br /> 10/26/00 <br />